Site work for a water / sewer project in Neptune Beach, Florida. Completed plans call for site work for a water / sewer project.

The Selected Bidder shall furnish, unless otherwise noted, all necessary permits, labor, equipment, materials, and incidentals necessary for a functional and complete system ready for intended use. Work includes, but is not necessarily limited to, all the items described in the Contract Documents, and generally described as the following: The required work includes installation of Public Supply Well 5 in accordance with project standards including the additional piping required to account for the vertical change in elevation, grouting, 24-inch outer surface casing, 16-inch primary steel casing, 12-inch open hole drilling, handling of discharge during well drilling, data collection requirements (lithology, geophysical logging, water quality testing), well development, step drawdown aquifer performance testing, plumbness and alignment test, well disinfection and bacteriological testing, layout, fittings, piping, transition fittings, adaptors, couplings, joint restraints, location wire, filling, flushing, cleaning, pressure testing (including temporary caps/plugs for testing as may be required), and all other improvements as shown on the drawings and included herein in the specifications. Providing all required bonds; insurance; mobilization; preconstruction site photographs and videos; erosion and sedimentation control; temporary facilities; coordination, locating, and notifications with all underground utilities; construction layout and staking; dewatering; clearing for service, abandonment, and restoration; associated sitework, excavations, trench boxing, temporary sheet piles, filling, compaction, grading, landscaping, irrigation repairs, site restoration, and site clean-up; removal and disposal of all associated construction debris; as-built surveys; and demobilization required to accomplish the construction of the public supply well. All materials, methods of construction, and standards must be in accordance with Federal, State and City laws, rules, standards, specifications, ordinances and the Contract Documents. Questions should be directed in writing by email to the Issuing Office at pwbids@nbfl.us no later than October 02, 2024, 2:00 PM local time The Buyer will evaluate the Bids, and the award will be made to the lowest, best, responsive, and most responsible Bidder selected by the Buyer. Certified minority business enterprises or minority persons are encouraged to timely submit their Bid for this project consistent with the terms of this Notice. Due consideration also will be given The Work to be performed under this Contract includes, but is not limited to, executing the Work set forth in the Contract Documents and generally described as follows: 1. Public Supply Well 5: a. Erosion and sediment control. b. General site work and grading. c. Install new 852-foot deep Public Supply Well 5 including casing, grout, and all associated appurtenances. d. Install new 46, wellhead flange with access ports, fittings, supports and appurtenances. e. Startup, testing, and commissioning. f. Well development. g. Step drawdown testing. h. Well disinfection. Bids will not be valid unless received in triplicate by the Bid deadline. Sealed packages should be mailed or delivered in person marked on the outside so that it is distinguishable from regular mail and package deliveries with the notation "BID ENCLOSED - CONB Bid No. 2025-01 Public Supply Well 5 to be opened on Wednesday October 09, 2024 2:00 PM Local Time.," addressed to the City Clerk, 116 1st St., Neptune Beach, FL. 32266, so as to guard against opening prior to the date and time set therefore.

Award

Water / Sewer

$368,000.00

Public - City

Site Work

13

20

10

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating, Painting
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, Air Outlets and Inlets
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Site Improvements, Fences and Gates, Retaining Walls, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Construction and Equipment, Roadway Construction, Vehicle Barriers
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
39
Bidding Soon
657
All Active Projects
315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2024

November 8, 2024

img_map_placeholder

1019 5th St, Neptune Beach, FL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Public Supply Well 5

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.