BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a sidewalk / parking lot in Stanton, Michigan. Completed plans call for site work for a sidewalk / parking lot.

Estimated project cost is $60k. The City of Greenville will receive sealed bids to acquire and install a lighting system for the Fred Meijer Trail Hub Phase 1. The work will consist of a Base Bid to include a new control panel and meter to feed an existing building and a total of 5 light fixtures with 12-foot and 20-foot high poles; and approximately 770 feet of wiring. In addition, the City will consider an Additive Alternate bid to support a lighting system along the Trail to be fed from the Base Bid panel. This work will consiste of an additional 13 light fixtures with 12-foot high poles and approximately 570 feet of wiring. This Project is locally funded. All questions from BIDDERS, regarding any part of the Plans or Project Manual, shall be directed in writing to: Doug Hinken, P.E., City Engineer City of Greenville 411 S. Lafayette Street Greenville, MI 48838 Or by email at: dhinken@greenvillemi.org The City Engineer will obtain answers to written questions, either through electronically. All questions, answers or resulting Addenda will be posted publicly at electronically. The CITY OF GREENVILLE reserves the right to accept to reject any or all BIDS for sound, documentable business reasons. The competency and responsibility of BIDDERS will be considered in awarding CONTRACTS. The CITY OF GREENVILLE is not obligated to accept the lowest or any other bid. The CITY OF GREENVILLE reserves the right to waive any informality or minor defects in any or all bids. The CITY OF GREENVILLE reserves the right to increase or decrease quantities of BID ITEMS at the stated unit price without additional compensation. The successful bidder will be required to furnish PAYMENT and PERFORMANCE BONDS in the amount of the CONTRACT prior to 14 days before beginning the Project. The Bonds shall remain in effect until the final acceptance of the project. BONDS shall be supplied through a company that is licensed to do business in the State of Michigan on a form that is consistent with the industry standard of practice. The CITY OF GREENVILLE expects to issue a NOTICE TO PROCEED by October 16, 2024, with prompt receipt of the fully executed CONTRACT and required BONDS and INSURANCE certificate. The CONTRACTOR shall begin Work within 10 days of the NOTICE TO PROCEED. The following is an expected schedule for the Work: Bid Opening: September 24, 2024 Recommendation to Award: October 2, 2024 Notice to Proceed: ~October 16, 2024 Installation of Foundations and Wiring, restoration: December 16, 2024 Installation of Lights and start-up: April 16, 2025 All questions from BIDDERS, regarding any part of the Plans or Project Manual, shall be directed in writing to: Doug Hinken, P.E., City Engineer City of Greenville 411 S. Lafayette Street Greenville, MI 48838 Or by email at: dhinken@greenvillemi.org

Award

Sidewalks / Parking Lot

$37,296.00

Public - City

Site Work

7

6

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
42
Bidding Soon
800
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2024

October 16, 2024

img_map_placeholder

395 E St, Stanton, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.