BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2024 at 7:00 PM

Updated November 11, 2025

Site work for a road / highway in Pequannock Township, New Jersey. Completed plans call for site work for a road / highway.

Route 23, Route 80 to CR 694 (Paterson-Hamburg Turnpike), ATS C#l, From MP 5.53 to MP 16.94, Contract No. 008216020, Township of Pequannock, Morris County, Boroughs of Riverdale, Kinnelon, Butler, and Township of Wayne, Passaic County; Federal Project No: 0023(339), UPC No: 216020, PE No: 0114509, CE No: 1604514 Estimated Completion Date on 01/08/2027 Estimated Range between $10,000,001 to $20,000,000 Project Labor Agreement Required: No Contractors Prequalified in one of these Work Types are eligible to bid this project: 33 The principal items of work consist of: Roadway Quantity Unit Description 15,928 LF 3" Rigid Metallic Conduit 44,785 LF ITS Conduit, Type A 84,589 LF Fiber Optic Cable Type G 18 U Controller, CTSS 68 U Adaptive Image Detector, CTSS 37 U ITS Roadside Unit, Type_Type A Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d). Minimum Wage Rates for This Project Shall Be as Specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on File With This Department. The Attention of Bidders is Directed to the Provisions Covering Subletting or Assigning The Contract to Section 108-prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. The Entire Work is to Be Completed on or Before the Estimated Completion Date Stated Above. DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33 NJDOT: 149 - Rt 23, Rt 80 To CR 694 (Paterson Hamburg Turnpike), ATS C#1 The deadline for submitting inquiries will not be extended and is 12:00 noon on October 3, 2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The deadline for submitting inquiries will not be extended and is 12:00 noon on October 3, 2024

Award

Roads / Highways

$18,550,154.00

Public - State/Provincial

Site Work

1570

4

8

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
944
Active Projects
425
Bidding Soon
6,657
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

December 17, 2024

Project location map

NJ-23, Pequannock Township, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.