Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 30, 2024 at 7:00 PM

Updated December 31, 2024

Site work for a religious / funeral development in Lovell, Wyoming. Completed plans call for site work for a religious / funeral development.

Request for Proposal Cowley Cemetery Fence Replacement The cemetery is located on Lane 8 1/2 southeast of town. The project includes: Remove and dispose of the existing fence on the West, South and East sides of the cemetery (sketch available). The West and South sides are 100% vinyl while the East side is approximately 75% vinyl and 25% chain link. Provide and install new 5 ft. tall black vinyl coated chain link fencing on all three sides. Include a 20 ft. sliding (one panel or two) gate in the center of the South fence. If possible, utilize holes left from the removal of the existing fence for the posts of the new one. If not feasible, the abandoned holes will have to be reclaimed (filled with compacted sand) by the successful bidder. Post backfill shall be concrete. Note: A temporary electric fence may be required to keep grazing animals out of the cemetery if the work is done in the winter. There is one installed now to protect the vinyl fence. Any foliage that may need to be removed to complete the project shall be the responsibility of the successful bidder.

Post-Bid

Religious / Funeral

$100,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
13
Bidding Soon
213
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

December 2, 2024

Project location map

To Be Determined, Lovell, WY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed