BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Norman, Oklahoma. Completed plans call for the renovation of a educational facility.

Moore Norman Technology Center School District No. 17 is seeking price quotations for the Repair of(3) Marley SPX Cooling Towers Please contact me at angie.gallagher@mntc.edu or (405)-801-5168. Repairs for Marley Model NC8407SM-10 Cooling Tower, S/N 10028061-A1,B1 and C1, 3 Cell(s), 1-story rooftop location o The heat transfer fill shall be constructed of 15 mil polyvinyl chloride (PVC) after forming. Fill shall be resistant to rot, decay and biological attack; formed, cross fluted bonded together for strength and durability in block format for easy removal and replacement; self- extinguishing with flame spread rating of 5 per ASTM E84-81a; able to withstand continuous operating temperature of 120F; fabricated to ensure water breaks up into droplets; specially treated to resist ultraviolet light. The fill shall be supplied by an original equipment cooling tower manufacturer who has used the proposed fill in a CTI certified crossflow cooling tower to ensure there will be no performance loss to the equipment. o Fill Kit shall include pultruded fiberglass bottom supports providing a minimum 5" clearance between the cold water sump floor and the bottom of the fill for proper maintenance and cleaning of the cold water sump. o Fill kit shall include all intermediate and upper fill supports, and all eliminator supports. All supports shall be constructed of pultruded fiberglass. Flexible membrane air seals shall be installed on the air inlet to prevent water from leaking out the top of the fill bundles, and to prevent air from by-passing the heat transfer section of the fill pack. o All fill bundles shall be capable of being removed and re-used in order to provide access to all internal sheet metal surfaces and sheet metal seams, to allow for maintenance or repairs. o Fill kit shall include separate stand-alone drift eliminators with a drift loss of .002% of the re-circulating water. o Fill kit shall include built in air inlet louvers with drainage channels between the built in louver and the heat transfer portion of the fill sheet to reduce circulating water exposure to sunlight, and to allow for treated water to flow over the fill at the top of the bundle and prevent the build of calcium carbonate between sheets in the top portion of the fill pack on the air inlets. o Thermal performance guarantee provided by a cooling tower manufacturer to be provided at time of bid. o Acceptable manufacturers Baltimore Aircoil, Evapco, Marley. o Minimum of a 2-year warranty on parts and labor. Ensure that HVAC systems remain functional during the project and that any interruptions are minimal o Perform lock-out, and tag-out procedures o Remove existing hanging sheet fill and hangers o Install new fiberglass fill supports o Install new 15 MIL bottom supported PVC pack fill media with integrated louvers and drift eliminators o Clean hot water basins and inspect mechanical o Remove locks and return cooling tower to the owner for start-up o Repeat the process on the remaining 2 towers o Receiving, deliveries, unloading, and storing new materials upon delivery in lay down vicinity of the cooling tower or fluid cooler coordinated with the owner. o Hoisting new materials to the roof. o Lowering old materials from the roof. o All demolition debris must be promptly removed from the school premises. o Crane or Lift Device to assist hoisting/lowering of materials, or to assist removal/installation of materials to be provided by contractor if applicable to the job o Plywood for roof protection, if applicable to the job. o For the specifications, the campus will be closed on the following days, which can serve as options for workdays: o November 25-29, 2024 (Thanksgiving break) o December 23, 2024 - January 3, 2025 (Winter break) o March 17-21, 2025 (Spring break) o These dates can be proposed or incorporated into any work schedules to align with campus closures.

Post-Bid

Educational

$150,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
47
Bidding Soon
440
All Active Projects
200
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2024

November 13, 2024

img_map_placeholder

4701 12th Ave NW, Norman, OK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.