BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2024 at 8:00 PM

Updated October 23, 2024

Site work and paving for a mixed-use development in San Diego, California. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Project Type RFP (Request for Proposal) Response Types Response File Type of Award Lump Sum Estimated Bid Value Between $1.8 million and $ 2.2 million The Scope of Services defines the extent of design-consultant services to complete the work and documents specified herein for Design (Plans, Specifications, and Estimates), assistance during the bidding and award stage, Construction Support, and As-Built generation of La Jolla Improv 4, herein referred to as Project. The City of San Diego has established this Project for the replacement of aging water and sewer pipelines within Council District 1 within the La Jolla community. The design consultant will be required to provide services for the following improvements: Water Improvements: Construction of approximately 11,008 LF (2.08 mi) of water mains to replace existing 4-, 6-, 8- 10- and 12-inch AC water mains via open trench, including associated appurtenances. Abandon approximately 611 LF (0.12 mi) of water mains in existing easements. Replace one pressure regulating station with an 8-inch regulating valve. Install approximately 600 LF (0.11 mi) of new water mains on private street with existing easement and transfer existing water services to the new main. Sewer Improvements: Construction of approximately 2,921 LF (0.55 mi) of sewer mains to replace existing 6- and 8-inch VC sewer mains. Rehabilitation of approximately 1,682 LF (0.32 mi) of 8-inch sewer mains. Abandon approximately 1,064 LF (0.20 mi) of 6- and 8-inch sewer mains. Transfer one sewer lateral from abandoned main to the parallel sewer main. Install approximately 675 LF (0.13 mi) of new 8-inch sewer mains. Resurface Improvements: Resurface approximately 3,653 LF (0.69 mi) of streetswith AC Overlay. Curb ramps are anticipated at Caminito Avola and Caminito Rialto (private streets). Installation and Restriping bike facility lanes. Environmental Services: AMND for archeological monitoring could be required. Biologist to investigate MHPA areas. Geotechnical evaluation may be needed. Geological hazards landslide categories present: 21 Confirmed, known, or highly suspected and 22 Possible or conjectured. Potential historic district. MHPA in the area - some areas include vegetation but no swimming pools are anticipated, in particular at 7863 E Roseland Dr. There is likely existing coastal sage scrub. No wetlands anticipated and no Coastal Development Permits are anticipated. The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$2,200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
89
Bidding Soon
1,372
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

December 23, 2024

Project location map

Multiple Locations, San Diego, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.