BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 3, 2025

Site work and paving for a civil project in Camden Wyo, Delaware. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Pre-Bid Meeting : Yes Microsoft TEAMS virtual meeting. Join on your computer or mobile app: Click here to join the meeting -->> Link in description Or call in (audio only) Or Join on a video conferencing device +1 302-504-8986,,996856038# Wilmington Tenant key: teams@sod.onpexip.com Phone conference ID: 996 856 038# Video ID: 114 439 619 3 Dbe Goal: 11% Disadvantaged Business Enterprise Goal Location: Kent County These Improvements Are More Specifically Shown on the Location Map(S) of the Attached Plans. Description: the Improvements Consist of Furnishing All Labor and Materials for This Project Which Provides a Connection on New Alignment From Sr10 East of the Railroad, Traversing an Open Area Behind the Eseco Industrial Park Tying Into a Proposed Roundabout on Upper King Road. The New Alignment Will Then Traverse the King Property Tying Into the Existing Signal on Us13 in the Vicinity of the New Grottos Pizza & Wawa Store. The New Alignment Will Also Provide Connections to the Local Roadway Network Within the Project Limits. Follow Other Incidental Construction in Accordance With the Location, Notes and Details Shown on the Plans, and as Directed by the Engineer. Completion Time: All Work on This Contract Must Be Complete Within 436 Calendar Days. Extensions of Contract Time Due to Weather Are Specified in the Standard Specifications Section 108.7f, Weather Days. It is Estimated a Notice to Proceed is Issued Such That Work Starts on or About July 7, 2025. Questions : E-MAIL TO; dot-ask@delaware.gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. Performance-based Rating System - 29 Del.c. $6962 (C)(12)(a) Requires Deldot to Include a Performance-based Rating System for Contractors. The Performance Rating for Each Contractor Shall Be Used as a Prequalification to Bid at the Time of Bid. DE DOT - West Camden Bypass

Bid Results

Roads / Highways

$21,255,777.00

Public - State/Provincial

Paving, Site Work

269

14

2

9

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
215
Bidding Soon
2,927
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

July 7, 2025

Project location map

US-13 & DE-10, Camden Wyo, DE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.