BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Bristol, Tennessee. Completed plans call for the renovation of a municipal facility.

The Bristol Redevelopment and Housing Authority (BRHA) will accept sealed BIDS for the installation of fourteen (14) BRHA-supplied boilers on BRHA properties in Bristol, Virginia. The project shall consist of but not be limited to, furnishing all labor, and equipment and performing all work required for installation, and all associated work as specified in and shown in the specifications of the Invitation for Bid. Period of Contract: 60 Calendar Days. Comments or Questions Due: October 14, 2024 by 4:00 P.M. In Writing to: Kris Littreal, BRHA 120 Hope Lane, Bristol, Virginia 24201 Fax: 276-642-2009 Klittreal@brha.com. SCOPE OF SERVICES The work to be performed by the Contractor shall include, but not be limited to, the supplying of all labor, equipment, tools and any services, accessories and procedures necessary to perform under these specifications. The BRHA properties to be serviced are as specified in Exhibit "B" BRHA Site Map. 1. Removal and proper disposal per local, state and federal codes of fourteen (14) boilers in seven (7) Johnson Court buildings. 2. Proper installation, start up and verification of operation of fourteen (14) BRHA supplied Weil McLain boilers per manufacturers recommendations. 3. The Contractor is responsible for all cleanup of trash and debris resulting of removal and installation of the fourteen (14) boilers. 4. The Contractor shall protect all buildings, vehicles, furniture, equipment, personal items, trees, shrubs. Lawns and all landscaping on BRHA property from damage. Any damaged property shall be repaired or replaced at the Contractor's expense. The Contractor shall protect all work and materials from damage by his work, workmen, subcontractors' work or subcontractor's workmen. Any damage to existing utilities, equipment or finished surfaces resulting from the performance of this contract shall be repaired to BRHA's satisfaction at the Contractor's expense. 5. The Contractor is responsible for submitting Davis Bacon Certified payroll weekly beginning the week after work commences. HUD-5282 is required to be submitted prior to commencement of work. 6. The Contractor is responsible for any required permits.

Post-Bid

Municipal

$163,570.00

Public - City

Renovation

3

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
21
Bidding Soon
395
All Active Projects
174
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

November 18, 2024

img_map_placeholder

Multiple Locations, Bristol, TN

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.