BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and outdoor lighting for a mixed-use development in Woodlake, California. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

The project will construct Class I bike path, ADA-compliant sidewalks and ramps, drought-tolerant landscaping and irrigation, energy-conserving lighting, storm drain facilities, and street improvements at the Woodlake Botanical Garden and along East Naranjo Blvd (SR-216). There will also be the removal of two parking lots, the installation of park features, ADA-complaint sidewalks and ramps, and drought-tolerant landscaping and irrigation at the Woodlake City Park. A midblock crosswalk and a "HAWK" Pedestrian Hybrid Beacon System to be installed to connect Woodlake City Park with the Botanical Gardens on East Naranjo Blvd (SR-216). The proposed project will increase pedestrian safety and connectivity between the City Park and downtown area to the Botanical Garden and Bravo Lake for recreation opportunities. All requests for information (RFI) must be submitted in writing to Marisa.Menchaca@qkinc.com before noon on Tuesday, October 15, 2024. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. FUNDING SOURCE This Project is being funded by Clean California Grant Program and Local Funds and will be subject to all applicable State Wage Determinations and Labor Compliance Requirements. BASIS OF AWARD The project, if awarded will be based upon all the work contemplated in the total bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. ENGINEERS ESTIMANTE RANGE: $5,200,000 to $5,700,000

Post-Bid

Sidewalks / Parking Lot

$5,700,000.00

Public - City

Outdoor Lighting, Paving, Site Work

155

13

30

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
21
Bidding Soon
329
All Active Projects
143
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

December 23, 2024

img_map_placeholder

E Naranjo Blvd, Woodlake, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.