Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 21, 2024 at 8:00 PM
Updated October 22, 2024
Site work, paving and new construction of a mixed-use development in Shawnee, Oklahoma. Completed plans call for the construction of a residential development; for site work for a residential development; road / highway; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Description of work includes but is not limited to New construction of Eight (8) Housing Structures consisting of Two, Three and Four-bedroom duplexes ranging from 1800 to 4353 sq ft., Area of Refuge 1432 sq ft, and Playground. This bid is considered as Phase III of a Four Phase bidding process. These residences will include the following Exterior finishes include an option for ownership to change similar materials of lap, batten, and shingle siding, paint colors, and masonry for additional structures. Interior finishes that include paint, tile, and millwork. Structural and non-structural wood framing, foam insulation, concrete slab and foundations and pre-engineered wood trusses, driveways and sidewalks. Residential exterior and interior LED lighting, plumbing, electrical, mechanical. Residential Energy Star appliances and EPA Indoor Air Plus standards for equipment, casework, and accessories for bathrooms, laundry closets, and kitchens. Architectural Asphalt shingles and/or metal roofing throughout. Site work areas of work will occur in designated plots on a pre-planned neighborhood and extend between unit plot lines. These new plots will include the following Driveways extending to existing curb and gutter. Utilities extending to existing stubbed-out utilities. edestrian ramped paving, sidewalks, patios, and vehicular driveways with paver accents. Non-irrigated landscaping, ground cover, plantings, and trees. Signage and accessibility systems and lighting. A cashier s check, a certified check, or surety bond in the amount of five percent (5%) of TOTAL BID shall accompany the sealed bid of each bidder. The Nation Reserves the Right to Reject Any and All Bids. construction of Eight (8) Housing Structures consisting of Two, Three and Fourbedroom duplexes ranging from 1800 to 2000 + sq ft., Area of Refuge, and Playground. This bid is considered as Phase III of a Four - Phase bidding process.
Post-Bid
Residential Subdivision
$300,000.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 18, 2024
November 18, 2024
44007 Hardesty Rd, Shawnee, OK
Related To This Project
Shawnee, OK
Bid Date: Jun 20 2025
Shawnee, OK
Bid Date: Nov 26 2024
Shawnee, OK
Bid Date: Dec 05 2024
Shawnee, OK
Bid Date: Jan 02 2025
Shawnee, OK
Bid Date: Jan 14 2025
Shawnee, OK
Bid Date: Jan 09 2025
Shawnee, OK
Bid Date: Jan 14 2025
Shawnee, OK
Bid Date: Dec 10 2024
Shawnee, OK
Bid Date: Aug 29 2024
Shawnee, OK
Bid Date: Aug 15 2024
Shawnee, OK
Bid Date: Aug 12 2024
Shawnee, OK
Bid Date: Aug 06 2024
Shawnee, OK
Bid Date: Aug 06 2024
Shawnee, OK
Bid Date: Jul 09 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
