Site work and new construction of a playground / park / athletic field in Spring Valley, Illinois. Working plans call for site work for a playground / park / athletic field; and for the construction of a 832-square-foot, one-story above grade playground / park / athletic field.

As of December 6, 2024, bids received were rejected. Project will rebid but no definite date yet. Construction of a one-story, 832+ S.F. masonry structure consisting of split face/split rib CMU block, trussed roof structure with asphalt shingles, men's & women's restroom with vitreous china fixtures, FRP interior ceiling finish, poured concrete floor, standard painted CMU interior walls, steel rolling counter concession doors and insulated steel entry doors. Bidders are advised that this Contract will be subject to the Illinois Steel Products Procurement Act The successful Bidder shall provide at least 40% of all labor required for the completion of this project. The Bid shall be accompanied by a certified check or bid bond, in the amount of five percent (5%) of the gross amount of the bid and be payable to the order of the City of Spring Valley. Bids may be held by the City of Spring Valley for a period not to exceed 60 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. The Owner reserves the right to accept or reject any or all Bids and to waive any informalities in the bidding. Question Deadline 11/05/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information shall be provided on the Bidding Documents Website (www.chamlin.com). Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Final Planning

Playgrounds / Parks / Athletic Fields

$383,060.00

Public - City

New Construction, Site Work

8

20

6

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Shingles and Shakes
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
122
Bidding Soon
1,765
All Active Projects
748
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

June 6, 2025

img_map_placeholder

116 E St Paul St, Spring Valley, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Mini Park Restroom / Concession Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.