Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Rolla, Missouri. Completed plans call for the renovation of a educational facility.
The project generally includes HVAC upgrades for Norwood. Parker, and Harris Halls. Demolition shall include removal of all VRF systems in all Buildings. Architectural work shall consist of ceiling removal and replacement as indicated on the drawings, new soffits and chases for mechanical work, and patching. Structural work shall. consist of all structural support necessary for new mechanical equipment and building penetrations. Mechanical work shall consist of new AHUS, VAVs, and FCUs and all associated temperature controls for Norwood, Parker, and Harris Hall and new wet pipe sprinkler system for Harris Hall. Electrical work shall consist of power for all new HVAC equipment and lighting replacement/upgrades as indicated in the drawings. 640 X Design and Construction Management General Services Building 1701 Spruce Drive Rolla, Missouri 65409 (573) 341-7618 The Contractor shall have as a goal, subcontracting with Minority Business Enterprise (MBE) of ten percent (10%), with Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), and/or Veteran Owned Business Enterprise, of ten percent (10%), with Service-Disable Veteran Owned Business (SDVE) of three percent (3%) of awarded contract price for work to be performed. Questions regarding the scope of work and commercial conditions should be directed to Jack Mentink, PE, Project Manager at (573) 341-6212 or jackmentink @mst.edu. Doc Notes: A download is available for a (non-refundable) purchase. Neither owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda (if any) obtained from sources other than the issuing office. All Contract Documents must be obtained by the Bidder from ADS to be an Eligible Bidder. BUILDING DESIGNATED CONSTRUCTION TIME PERIOD HARRIS HALL MAY 22, 2025 TO JANUARY 5, 2026 PARKER HALL DECEMBER 22, 2025 TO JUNE 29, 2026 NORWOOD HALL JUNE 3, 2026 TO DECEMBER 27, 2026 Construction Estimate Base Bid: $11,000,000 - $12,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Clarify all questions concerning sequences of operation with the Mechanical Engineer. Any request for interpretation shall be delivered to the Architect at least one (1) week prior to time for receipt ofbids. Work shall be performed under this Contract on the campus of the University of Missouri - Missouri University of Science and Technology at Norwood, Parker, and Harris Hall, Rolla, Missouri 65409.
Post-Bid
Educational
$12,500,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2024
December 29, 2024
Multiple Locations, Rolla, MO
Related To This Project
Rolla, MO
--
Rolla, MO
Bid Date: Nov 13 2024
Rolla, MO
Bid Date: Oct 16 2024
Rolla, MO
--
Rolla, MO
--
Rolla, MO
Bid Date: Nov 20 2024
Rolla, MO
Bid Date: Oct 18 2024
Rolla, MO
Bid Date: Sep 17 2024
Rolla, MO
Bid Date: Oct 03 2024
Rolla, MO
Bid Date: Sep 24 2024
Rolla, MO
Bid Date: Sep 24 2024
Rolla, MO
Bid Date: Jun 12 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.