BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Rolla, Missouri. Completed plans call for site work for a water / sewer project.

HY Point Lift Station Force Main Improvements The Hy Point Lift Station Force Main Improvements project shall include, but not be limited to: 1. Construction of 3,513 LF of 8 IN DR-11 IPS HDPE sanitary force main, to include isolation valve assemblies, combination air valve assemblies, and all other associated appurtenances. 2. Construction of a 546 LF, 16 IN Dia steel cased highway/ railroad bore via auger boring methods. 3. Construction of a gravity sewer main consisting of 724 LF of 10 IN SDR-35 PVC, three precast concrete manholes and all associated appurtenances. 4. Construction of 2795 LF of 4 IN DR-11 IPS HDPE sanitary force main, to include isolation valves, combination air valve assemblies, and all other necessary appurtenances. Non discrimination in Employment - Bidders on this work will be required to comply with the President's Executive Order Number 11246. Requirements for bidders and contractors under this order are explained in the specifications. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109, and E.O. 11246. Failure to include the label information on the sealed bid envelope shall be returned without further consideration. Each bidder must submit a bid security in the amount of five percent (5%) of their total bid. The Owner reserves the right to reject any or all bids, to waive informalities or irregularities, and to determine the lowest responsive and responsible Bidder, and to award the contract on that basis. All Labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Missouri Department of Labor and Industrial Relations, Division of Labor Standards. Est. Value Notes: $1.1M Est. Completion Date: Oct. 1, 2025 Project No. CMA 22141910-TO2 ARPANo. C8FBDBDEFC90

Post-Bid

Water / Sewer

$1,100,000.00

Public - City

Site Work

15

16

13

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
22
Bidding Soon
564
All Active Projects
213
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.