BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Fillmore, Utah. Contact the soliciting agency for additional information.

The Utah Communications Authority ("UCA") This courtesy posting is an advertisement of a procurement opportunity for The Utah Communications Authority ("UCA"), not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The contract award for this solicitation will not be posted on this website. Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendor's response will still be evaluated by The Utah Communications Authority ("UCA") as described in the solicitation document. The Division of Purchasing is neither the issuing or conducting procurement unit for this solicitation, as such it is the vendor's responsibility to review the entire solicitation in order to comply with any requirements. Q&A due by: 9/25/24 at 3PM MT via Electronically. as part of UCA's Notch Peak agreement with the Bureau Land Management (BLM), UCA needs to paint the equipment shelter, generator shelter, and propane tank (the "Project"). This is a BLM specific color that they have requested. The Notch Peak Site is located in Millard County located 60 miles west of the city of Filmore, more specifically at 3911'16.30"N -11324'34.31"W. The equipment shelter, generator shelter, and propane tank (See Exhibit A) must be painted "Shadow Gray" as specifically required by the BLM. Vendors to list procedures and specific products they will be using for painting, as well as the preparation for painting galvanized surfaces and non-galvanized surfaces. This includes cleaning, priming masking etc. Items to be painted include: o New 1000-gallon propane tank. o Used, 15-year-old 24' X 12' X app 9' prefabricated equipment shelter with stone aggregate exterior. o All elements EXCEPT THE ITEMS LISTED BELOW to be painted, this includes two large wall mounted HVAC units, PVC and steel conduits, junction boxes etc. Gree exterior mounted HVAC mini split. Exterior ground bus bar. Coaxial cables entering shelter. Roof. o New 9' X 12' X 9'2" Enviro brand modular generator shelter, painted steel exterior with stainless steel ductwork. o All galvanized steel on ductwork, trim etc. must be properly cleaned, etched and primed with non-oil based primer prior to painting. o All steel and PVC conduits and junction boxes to be painted. o Do not paint roof. Work to be professional and clean with no overspray or dripping on surfaces that are not intended to be painted, including concrete pads, tower parts or natural terrain. Vendor to warranty paint job on all surfaces for two years after completion. In the event the paint comes off within the first two years, vendor to return to site to repair or touch up failed areas at no charge. 2. The work must be completed by October 11, 2024.

Post-Bid

Municipal

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
31
All Active Projects
14
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2024

September 30, 2024

img_map_placeholder

To Be Determined, Fillmore, UT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.