Published October 16, 2024 at 8:00 PM
Updated October 31, 2024
Demolition and site work for a civil project in Winnipeg, Manitoba. Completed plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; and water / sewer project.
Demolition of the existing Structure No. 2 at the Falcon Lake Dam and replacement with a new reinforced concrete box culvert complete with overshot (tilting weir) gates and operation platform. Construction staging will consist of a two-stage construction utilizing a shoofly detour and will include full restoration of the existing site including repaving the disturbed area. The Existing Structure No. 1 (CSP plate Girder) to the north will remain as is and be used to pass flow during construction. Completion Model the Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Liquidated Damages Sub Completion Date the Culvert, Platform and Stoplogs Must Be Operable, and All Work Other Than Installation of the Permanent Weir Gate, Paving, Site Restoration and Revegetation Must Be Completed by No Later Than March 31, 2025 (the "Sub- Completion Date"). Daily Liquidated Damages After This Specified Sub-completion Date Will Be Charged to the Contractor at the Rate of One Thousand ($1,000.00) Dollars Per Calendar Day Until the Work is Completed. In Addition to the Daily Liquidated Damages, a Lump Sum Liquidated Damage of Twenty-five Thousand ($25,000.00) Dollars Will Be Charged to the Contractor if the Work is Not Completed by March 31, 2025. In Addition, the Lump Sum Liquidated Damages Will Be Charged to the Contractor on a Recurrent Annual Basis Until Substantial Completion. Completion Date All Remaining Work Including Installation of the Permanent Weir Gate, Paving, Site Restoration, and Revegetation Must Be Completed by No Later Than July 31, 2025. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of One Thousand ($1,000.00) Dollars Per Calendar Day Until the Work is Completed. The Maximum Liquidation Damage Charged at Any Given Time Shall Be One Thousand ($1,000.00) Dollars Per Calendar Day Until the Work is Completed. Seasonal Shutdown Date No in-water Work Allowed Between April 1 and June 15 of Any Year. Lane Closures Shall Not Be Permitted Between May Long Weekend and September Long Weekend of Any Year Excepting the Work Required Under the Completion Date Without Specific Approval From Mti and Must Be Limited to the Absolute Minimum Possible. Question Acceptance Deadline: 2024/10/08 12:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Project Awarded as per Advance Award policy
Award
Bridges / Tunnels
$2,546,288.00
Public - State/Provincial
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 10, 2024
November 11, 2024
MB-1, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Oct 17 2024
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Oct 16 2024
Winnipeg, MB
Bid Date: Feb 19 2025
Winnipeg, MB
Bid Date: Oct 24 2024
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Oct 18 2024
Winnipeg, MB
Bid Date: Oct 09 2024
Winnipeg, MB
Bid Date: Oct 15 2024
Winnipeg, MB
Bid Date: Oct 16 2024
Winnipeg, MB
Bid Date: Sep 23 2024
Winnipeg, MB
Bid Date: Oct 02 2024
Winnipeg, MB
Bid Date: Oct 04 2024
Winnipeg, MB
Bid Date: Oct 10 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.