Demolition and site work for a civil project in Winnipeg, Manitoba. Completed plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; and water / sewer project.

Demolition of the existing Structure No. 2 at the Falcon Lake Dam and replacement with a new reinforced concrete box culvert complete with overshot (tilting weir) gates and operation platform. Construction staging will consist of a two-stage construction utilizing a shoofly detour and will include full restoration of the existing site including repaving the disturbed area. The Existing Structure No. 1 (CSP plate Girder) to the north will remain as is and be used to pass flow during construction. Completion Model the Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Liquidated Damages Sub Completion Date the Culvert, Platform and Stoplogs Must Be Operable, and All Work Other Than Installation of the Permanent Weir Gate, Paving, Site Restoration and Revegetation Must Be Completed by No Later Than March 31, 2025 (the "Sub- Completion Date"). Daily Liquidated Damages After This Specified Sub-completion Date Will Be Charged to the Contractor at the Rate of One Thousand ($1,000.00) Dollars Per Calendar Day Until the Work is Completed. In Addition to the Daily Liquidated Damages, a Lump Sum Liquidated Damage of Twenty-five Thousand ($25,000.00) Dollars Will Be Charged to the Contractor if the Work is Not Completed by March 31, 2025. In Addition, the Lump Sum Liquidated Damages Will Be Charged to the Contractor on a Recurrent Annual Basis Until Substantial Completion. Completion Date All Remaining Work Including Installation of the Permanent Weir Gate, Paving, Site Restoration, and Revegetation Must Be Completed by No Later Than July 31, 2025. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of One Thousand ($1,000.00) Dollars Per Calendar Day Until the Work is Completed. The Maximum Liquidation Damage Charged at Any Given Time Shall Be One Thousand ($1,000.00) Dollars Per Calendar Day Until the Work is Completed. Seasonal Shutdown Date No in-water Work Allowed Between April 1 and June 15 of Any Year. Lane Closures Shall Not Be Permitted Between May Long Weekend and September Long Weekend of Any Year Excepting the Work Required Under the Completion Date Without Specific Approval From Mti and Must Be Limited to the Absolute Minimum Possible. Question Acceptance Deadline: 2024/10/08 12:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Project Awarded as per Advance Award policy

Award

Bridges / Tunnels

$2,546,288.00

Public - State/Provincial

Demolition, Site Work

42

5

2

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
10
Bidding Soon
225
All Active Projects
106
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

November 11, 2024

img_map_placeholder

MB-1, Winnipeg, MB


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.