BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Santa Ana, California. Completed plans call for the renovation of a 393-square-foot, one-story above grade clubhouse / community center.

Scope of work includes repair and renovation of existing 4 interior restrooms facilities to provide ADA Compliance at two restrooms, provide one additional restroom, & Janitor room. . Revised Engineers Estimate: $551,770 The Santa Ana Police Athletic & Activity League (PAAL) Center is located at 2627 West McFadden Avenue, Santa Ana CA 92704 Scope of Work: Repair and renovation of existing 4 interior restrooms facilities to provide ADA Compliance at two restrooms, provide one additional restroom, & Janitor room. Work will include the removal of walls and providing new wood framing walls with finishes per plans. Replacement of existing and new doors, door frame, and hardware in restrooms and Janitor room. New door signs and wall signs. Replacement of plumbing fixtures and toilet accessories. New ADA compliant shower stall and shower accessories. Removal of selective concrete slab to be replaced with new concrete slab. New floor tile, wall tile, gyp board, and paint finish at restrooms. New carpet tile, gyp board, paint, and rubber base. Replacement of existing and new LED light fixtures at restrooms and Hallway only. Structure is limited to replacement of headers at door openings and ceiling joists at restrooms only. There is no Building addition OR Exterior work in this scope of work. For hard copy drop offs, visitors will be routed to deliver in the grey drop box on the 1st floor of Ross Annex across from the Public Works counter. Gentle note: staff will not timestamp or sign any hard copy deliveries as the electronic submittal by the deadline is suffice. Type of Award: Lump Sum License Requirements California Class "B" Liquidated Damages $3,600 per calendar day Estimated Bid Value $467,000 Start/Delivery Date November/December 2024 Project Duration 100 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 10/07/2024 at 2:00 PM PT Online Q&A Yes Hard Copies for Verification Only; Electronic Submittal is Required by Deadline and Hard Copies May Be Accepted by Cob or Next Business Day.

Post-Bid

Clubhouse / Community Centers

$551,770.00

Public - City

Renovation

33

24

9

7

Subscribe For Documents

117 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
135
Bidding Soon
2,328
All Active Projects
1,087
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2024

November 28, 2024

img_map_placeholder

2627 W McFadden Ave, Santa Ana, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.