BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Milwaukee, Wisconsin. Contact the soliciting agency for additional information.

If you have any questions pertaining to the RFP, please submit them by email to DFMSProcurement@milwaukee.k12.wi.us prior to noon on Thursday, September 26, 2024. No questions will be answered after that date and time. The responses to questions submitted will be documented by way of addenda, which will be forwarded to all finns registered as receiving a copy of this RFP. If you have any further questions, please feel free to contact Steve Wellman of A/E graphics at 262-649-3965 or at stevew@aegraphics.com. Milwaukee Public Schools (MPS) Department of Facilities and Maintenance Services (DFMS) is soliciting competitive Request for Proposals (RFP) to retain professional engineering services for Recertification of Storm Water Management Plans for two (2) MPS locations in the City of Milwaukee, WI. Storm Water Management Plans (SWMPs) were developed and approved for all of the sites during the year indicated in Attachment B. Per the City of Milwaukee, a written recertification must be submitted every five (5) years, prepared by a Professional Engineer. The recertification will verify that the drainage facility is operating as originally designed and is actively maintained as outlined in the SWMP and WDNR Post-Construction Technical Standards. This is the first time that MPS is recertifying their SWMPs and confirming BMPs are being maintained and are operating as originally designed. B. Visit each site and provide appropriate tests, observations, measurements and photos to fill out the following forms to be submitted for each site: 1. Visual Inspection form for Illicit Connections 2. Storm Water Management Plan Recertification Form C. Any site for which consultant identifies deficiencies, consultant shall provide a report to MPS within 3 days of each site visit to identify deficiencies found. MPS will attempt to correct the deficiency prior to submitting the final report. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
63
Bidding Soon
1,064
All Active Projects
421
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

img_map_placeholder

Multiple Locations, Milwaukee, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.