BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

New construction of a bridge / tunnel in Council Bluffs, Iowa. Completed plans call for the construction of a bridge / tunnel.

A. The Work is located in the City of Council Bluffs, Iowa within Rivers Edge Park riverward of the levee at Avenue B. The project includes the Treetop Walk and Tower area, which is located on the north side of the park in the vicinity of the Bob Kerrey Pedestrian Bridge. B. Work to be performed under this Contract generally includes the work described in paragraph 1.2.C below. C. Contracting Method: The Project will be constructed under a single prime construction contract. The Work of this Contract generally includes the following: site clearing, stripping, and removals as shown on the Plans, placement of stormwater pollution protection BMP's, and the construction of water, sewer, and electrical utilities as well as construction of the Tree Top Walk and the Adventure Tower structures which include subsurface deep foundations, support piers, elevated pedestrian walk and the tower structure. The project also includes construction of a concrete maintenance access drive as well as landscaping, seeding, and other site restoration. The project includes the construction of a temporary crossing of the drainage channel for the purpose of providing access to the construction site for the crane and other construction equipment. The temporary access will include the placement of temporary drainage structures and fill in the channel and the removal of the culverts and fill at the completion of construction. The Contractor shall complete all work as indicated on the plans and specifications and as required for a full and complete functioning project as intended by the contract documents. Furnish all labor, materials, tools, equipment and services as indicated in accordance with provisions of Contract Documents. 1. It is the intent of the Contract Documents to describe a functionally complete project. Furnish and install all supplementary or miscellaneous items, appurtenances, and devices incidental to or necessary for a sound, secure, complete, and functional installation. This project consists of 8,800 square foot bridge pier leading to the mouth of the Missouri River. The project is located in Council Bluffs, IA and includes drilled pier foundations, auger cast foundations, earthwork, landscaping, structural steel, concrete foundations and flatwork, thermally modified wood planking, porcelain pavers, plantings, irrigation, painting, and plumbing, Please note the specifications are inclusive of scopes that are part of the North development. Some sections may not apply to the South Pier and may be ignored. NOTE THAT STRUCTURAL STEEL AND DEEP FOUNDATIONS HAVE BEEN AWARDED AS PART OF A PRIOR BID PACKAGE. NO STRUCTURAL STEEL OR DEEP FOUNDATION PROPOSALS WILL BE CONSIDERED. ELECTRICAL WILL BE ISSUED AS PART OF A LATER BID PACKAGE. The project is taxable and sales tax shall be included as part of the proposal. Lueder Construction requests bidders provide a breakout of the sales tax included in your proposal. Lueder Construction, on behalf of the Owner, requests voluntary alternates to present to the Owner. Proposed voluntary alternates will not be shared among other bidders. All questions shall be submitted to jsullivan@lueder.com. Bidders shall send bids to jsullivan@lueder.com. Lueder Construction is committed to providing equal employment opportunities to all individuals. We do not discriminate on the basis of race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability, or any other characteristic protected by applicable law. All employment decisions, including hiring, promotion, and termination, will be made based on qualifications, merit, and business needs. We strive to create a diverse and inclusive workplace where all employees feel valued and respected.

Post-Bid

Bridges / Tunnels

$12,500,000.00

Public - State/Provincial

New Construction

72

28

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
38
Bidding Soon
466
All Active Projects
236
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 1, 2024

img_map_placeholder

Rivers Edge Pkwy, Council Bluffs, IA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.