BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a mixed-use development in Coal Grove, Ohio. Completed plans call for the renovation of a educational facility.

Roofing Project at the Open Door School If you have any questions, please contact Jeff Townsend at the administrative office 740-532-7401. There is a mandatory pre-bid meeting. If the contractor neglects to sign the sign in sheet they will not be eligible to bid the project. Valid 5% bod bond, copy of Contractors License, copy of Workers' Compensation, and a copy of General Liability Insurance of $1,000,000.00, and a sample of the manufacturer's warranty will be included with the bid proposal. 100% performance bond for the successful contractor The cutoff time for all questions will be 10-03-2024 at 10:00 AM. All questions are to be submitted by e mail to Scott Smith at scott@ghisesmith.com Remove the existing reinforced EPDM leaving the existing 3" Polysio in place and dispose of debris in a legal manner. Replace all damaged or deteriorated deck after the owner verifies existing condition. Payment for any deck replacement will be assembled using the square foot cost on the bid form submitted by the contractor. o Replace any wet or damaged 3" polyiso with new 20 psi Insulbase Polyiso after the owner verifies existing condition. Payment for any 3" iso replacement will be assembled using the square foot cost on the bid form submitted by the contractor. o Install one layer of 1/2" thick, Secureshield HD polysiso (ASTM C1289 Type II, Class 4, Grade 1) with mechanical fasteners per manufacturers requirements to achieve a 20 year warranty with 72 MPH wind speed coverage with specified system. o Replace all deteriorated wood blocking after the owner verifies existing condition. Payment for nailer replacement will be assessed using the lineal foot cost on the bid form submitted by the contractor. The Open Door School Low Front Roof and Hallway is located at 606 Carlton Davidson Lane in Coal Grove, OH. Scott Smith, Project Manager/Coordinator, is the Owner's Representative and may be contacted regarding any questions or for a pre-bid job site inspection, phone 304-550-9580.

Award

Educational

$76,950.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
32
Bidding Soon
392
All Active Projects
159
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

November 7, 2024

img_map_placeholder

606 Carlton Davidson Ln, Coal Grove, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.