BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2024 at 7:00 PM

Updated December 4, 2024

Site work and renovation of a civil project in Salem, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

** As of 12/3/2024 project has been awarded to BuildTec Construction for $785,331 for Contract A , Caldwell Tanks for $1,584,700 for Contract B, o B&H Well Drilling & Pump Services for $548,949.93 for Contract C with a total amount of $ 2,918,980.93.** Water System Improvements. Site Address: 400 North Iron Site Directions: City of Salem 400 North Iron Salem, MO 65560. The Proposed Work Includes: The construction of the new Well No. 9 and includes new well, pitless unit, pump and appurtenances; new CMU Block Building including treatment system, piping system, HVAC system, plumbing, electrical, controls, instrumentation; site piping, fencing, and grading; approximately 1,420 LF of 8-in waterline construction including highway bore; and construction of a new multileg water storage tower. Requirement is further explained in the specifications. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109, and E.O. 11246. Bid envelope must state "Salem Water System Improvements". Each bidder must submit a bid security in the amount of five percent (5%) of their total bid. The Owner reserves the right to reject any or all bids, to waive informalities or irregularities, and to determine the lowest responsive and responsible Bidder, and to award the contract on that basis. All Labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Missouri Department of Labor and Industrial Relations, Division of Labor Standards. Document notes. Paper copies of the bidding documents may be obtained from the Engineer upon payment of a non-refundable sum of $200.00 for each complete set. An additional amount of $50.00 will be charged for mailing of bidding documents. Bid Results:- Contract A Buildtec Construction $785,331 Contract B Caldwell Tanks Inc $1,584,700

Award

Water / Sewer

$2,918,980.00

Public - City

Renovation, Site Work

28

32

15

8

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
76
Bidding Soon
796
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

November 18, 2024

Project location map

Multiple Locations, Salem, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.