BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a mixed-use development in Cold Lake, Alberta. Completed plans call for the demolition of a playground / park / athletic field.

1. Mobilization 2. Remove ten existing buildings and tanks from the campground, ensure site is free of all debris, and assist with setting up safety fence if deemed necessary by Parks representative. The tanks are concrete, approximately twelve feet by ten feet by six feet. The contractor will have to be able to break out the existing tanks and haul the debris approximately 8km to a dumpsite. Alberta Parks will ensure the tanks are empty. 3. Excavate new locations and backfill old locations which are with-in a few feet of each other. The new holding tanks are approximately twelve feet by sixteen feet by five feet. The contractor will be expected to supply a suitable laser level for setting accurate tank depths, tank depths will be set at each location by the AFP representative. The contractor will be required to complete all Alberta First Call locates. The contractor will be required to be onsite when the new tanks are delivered for adjustments to tank depth and backfilling the tanks. The contractor will be expected to have a packer attached to an excavator (Hoe Pack) for efficiency and safety while setting grade for the new tanks. 4. Parks Division will arrange to have all private locates done. Parks Division will have all utilities disconnected from the old buildings. Parks Division will provide 3/4 inch gravel for bedding and backfilling the new tanks. Approximately 400 yards of 3/4 gravel will be onsite for this purpose. 5. The contractor will have to supply a suitable tandem axle gravel truck to load and haul the provided gravel to backfill the new holding tanks once they are set in place. 6. Contractor must be a certified septic installer; proof of certification must be provided with bid. 7. Closeout Documentation Inquiries deadline will be by 6pm October 17,2024

Post-Bid

Playgrounds / Parks / Athletic Fields

$250,000.00

Public - State/Provincial

Demolition, Site Work

3

3

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
16
All Active Projects
4
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2024

November 25, 2024

img_map_placeholder

Township Rd 632A, Cold Lake, AB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.