BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2025 at 7:00 PM

Updated February 8, 2025

Site work for a civil project in Mississauga, Ontario. Conceptual plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.

This Project includes the construction of creek bank erosion control measures along one section of Sawmill Creek, beginning at the crossing at Folkway Drive, and extending approximately 1050m downstream, ending just before the culvert crossing at the trail connecting Rainbow Crescent to Erin Mills Parkway. TIMELINE: Tender was cancelled. Project may be followed once a re-tender is issued. Coverage of this report is discontinued at this time.

Project Abandoned

Water / Sewer

Public - City

Site Work

23

7

4

2

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
4
Bidding Soon
2,393
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

December 1, 2025

Project location map

South of Folkway Drive to Erin Mills Parkway, Mississauga, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.