Site work and new construction of a power facility in Fort Stewart, Georgia. Conceptual plans call for the construction of a power facility; and for site work for a power facility.
Project Description: Construct a 10 Mega Watt (MW) natural gas generation plant connected to Fort Stewart Substation. Install an underground natural gas line to service the generation plant. Provide each generator with a unit step up transformer to match the distribution voltage. A paralleling switchgear is to be provided for paralleling and control of the generators and connection of the redundant feeders to the substation. Potential transformers will be provided for relaying and metering requirements on each way. Protective relaying will be provided to include source protection, feeder protection, and generation protection and synchronization. Modify substation by upgrading the relaying on the circuit breakers to provide synchronization with the generators. Upgrade the feeder breakers to provide operational compatibility with new switchgear and the main service. Installation of a microgrid control system to match mission critical facility loads with available supply (in parallel operation and islanded modes). The microgrid control system will include, but not limited to the following: transfer switches, interface relays, microgrid controllers, and fiber optic communication connections. Install controls and connect to an existing solar photovoltaic (PV) array to the microgrid. This project will allow approximately 10MW of existing PV to be connected to the microgrid currently without causing a challenge with frequency fluctuations or voltage drops in the event of increasing cloud cover. Connect and integrate microgrid control system with existing SCADA system to allow remote read, write, management, communication, and operation of protective devices. Additional solar PV can be connected to the microgrid in the future to meet expanding demand. Install step down transformer to provide solar output connectivity to the microgrid system. The system is considered External Information Technology (IT) and should be secured in accordance with Department of Defense (DoD) 8510. The installation and private utility will need to agree on security controls that meet the intent of DoD 8510 and DoD 8520 Security of Unclassified Information on Non-DoD system. The installation may require the vendor to ensure design meets the intent of Unified Facilities Criteria (UFC) 4-010 06 Cyber Security of Facility Related Control Systems and any other current DoD Policy that is applicable. The microgrid will be installed on a stand-alone network with the possibility of an interconnection to the private utilities monitoring and control system. The microgrid system will be designed in accordance with United Facility Criteria 4-010-06 Cybersecurity of Facility Related Control Systems or current policy. All construction deliverables will be in accordance with Unified Facility Guide Spec 25 05 11 Cybersecurity for Facility Control Systems or current guide. Both documents can be located on the Whole Building Design site. Disclosure of Magnitude of Construction in accordance with DFARS 236.204(ii): Between $25,000,000 and $100,000,000 Sources sought responses require the following: 1. Submit a capability statement (does not need to be complex) that demonstrates the firm's ability to complete a project of this magnitude and complexity. Capability Statement should contain the following information: a. Company Name b. Address (as registered in System for Award Management - SAM) c. Point of Contact d. Phone number e. Email address f. CAGE Code/SAM UEI number g. any applicable socio-economic categories 2. Explain the complexities, regulations, and challenges the project creates in the current economic climate. Will long lead times for materials (normal or specialty materials), labor needs (standard skills or any specialty skills), or geographic location present issues with this acquisition 3. Provide bonding ability. Aggregate and per contract. 4. Submittal (Optional but preferred) Complete attached Project Labor Agreement (PLA) questionnaire. Submit Capabilities and PLA questionnaire to the Contract Specialist (Primary Point of Contact) by 1700 EST 11 October 2024 via email. A pre-solicitation is anticipated to be posted by mid-November 2024. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Power Plant
$100,000,000.00
Public - Federal
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 10, 2025
To Be Determined, Fort Stewart, GA
Related To This Project
Fort Stewart, GA
Bid Date: Nov 12 2024
Fort Stewart, GA
--
Fort Stewart, GA
Bid Date: Sep 15 2020
Fort Stewart, GA
Bid Date: Jul 25 2024
Fort Stewart, GA
Bid Date: May 28 2024
Fort Stewart, GA
Bid Date: Dec 03 2024
Fort Stewart, GA
--
Fort Stewart, GA
--
Fort Stewart, GA
Bid Date: Sep 02 2022
Fort Stewart, GA
Bid Date: Feb 07 2022
Fort Stewart, GA
Bid Date: Jan 19 2024
Fort Stewart, GA
Bid Date: Aug 11 2023
Fort Stewart, GA
Bid Date: Jul 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.