Published November 27, 2024 at 7:00 PM

Updated October 1, 2024

Site work and new construction of a pre-engineered storage facility in Sayreville, New Jersey. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

This Request for Bids ("RFB") involves all necessary labor, tools, equipment, material, and services required to complete all work as specified on the Contract Documents. Further information concerning this procurement is provided in the RFB for such services. No Bid will be accepted after the above referenced date and time. Any Bid received after the due date, whether by mail or otherwise, will be returned unopened. Each Bidder must submit with its Bid, Bid Security in the form of a Bid Bond executed by the Principal and Surety Company Attorney in Fact and witnessed to and attested with an appropriate Power of Attorney attached, or a cashier's check, or treasurer's check or certified check or money order made payable to the order of the Treasurer, Middlesex County Utilities Authority and in the amount of five percent (5%) of the Bid price. In addition to the Bid Security, each Bid must be accompanied by a Consent of Surety written by a Surety Company listed on the Federal Treasury List and is licensed to do business in New Jersey and acceptable to the Authority, that in the event of an award of the Contract to the Bidder, said Surety will furnish the required contract bond(s) in the sum of the full amount of the Bid as set forth and as required in the RFB. The contract bond(s) for this RFB include the following and must be from a surety company acceptable to the Authority and satisfying the requirements of the RFB: - Performance and Payment Bond - General Maintenance Bond The Successful Bidder will be required to present to the Authority the approved contract bonds duly executed and be prepared to execute the Contract within twenty-one (21) days of the date of receipt of the Notice of Contract Award. All Bidders and named Subcontractors must possess current and effective Public Works Contractor Registration Certificates ("PWCR") as of the Bid opening date. A Bidder who does not possess a valid PWCR as of the Bid opening date, or who names any Subcontractor in its Bid who does not possess a valid PWCR as of the Bid opening date, will be deemed ineligible for Contract award. Bidders may submit copies of all applicable PWCR certificates with their Bids. However, if copies of any of these certificates are omitted from the Bid, they shall be provided to the Authority prior to award, and within five (5) business days of its request. The Authority shall have the right to independently verify Bidders' and named Subcontractors' PWCR status from computerized systems maintained by the State and shall be guided accordingly in its award process. Should the Successful Bidder fail or refuse to execute the Contract and/or submit any other required documents within the time period set forth in this RFB, the Authority shall have the right to consider the Successful Bidder to have abandoned the Contract and the Authority may proceed to award the Contract to the next lowest responsive and responsible Bidder or if applicable, reject bids pursuant to N.J.S.A. 40A:11-13.2. Bids must be submitted in sealed envelopes with the name "MCUA: CONTRACT 22-9-1(CTP)/ CONSTRUCTION OF A CENTRALIZED STORAGE FACILITY AT THE CENTRAL TREATMENT PLANT" clearly marked on the outside of the envelope. Bids may not be e-mailed, faxed or transmitted over the telephone. This project is being funded partially through Federal Grants awarded by the State of New Jersey. The Federal Grant funding is through the Coronavirus State Fiscal Recovery Fund under the American Rescue Plan Act of 2021, P.L. 117-2, as amended. Consequently, this RFB and the Contract involved includes and incorporates the contract requirements under Federal funding procurement awards in accordance with 2 CFR Part 200 Appendix II. The Bidding and award of the Contract will be in compliance with the New Jersey Local Public Contracts Law (N.J.S.A. 40A:11-1 et seq.). By submitting a Bid, each Bidder, without any other act, acknowledges and agrees to comply with each of the terms and conditions of the RFB. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 et seq. As a result of the partial Federal funding involved with the Project, Bidders and their subcontractors must also be able to provide a Unique Entity ID ("UEI") from Sam.Gov (the System of Award Management) and must maintain an active SAM registration through Final Completion of the Project. Please consult online for more information or if you have questions about obtaining an UEI. The Authority will award a contract or reject all Bids within sixty (60) days after receipt of the Bids unless otherwise agreed by the parties in accordance with applicable law. Any inconsistency between this notice and the RFB shall be governed by the terms of the RFB. Any questions regarding this RFB should be directed in writing to Judith McCrone at jmccrone@mcua.com, as set forth in the RFB. The Authority reserves the right to waive any minor immaterial informalities or reject all Bids in accordance with the Local Public Contracts Law, N.J.S.A. 40A:11-1 et seq., as well as any other applicable law. Bidders are expected to examine the RFB and all related Bid documents with care and observe all their requirements. Ambiguities, errors, or omissions noted by Bidders together with all questions and requests for clarifications pertaining to this RFB shall be submitted via e-mail to 4878-6273-6084, v. 4 6 the attention of Judith McCrone, Procurement Specialist, at jmccrone@mcua.com or in writing to the Authority, by no later than 4:00 p.m. on October 11, 2024 at the Middlesex County Utilities Authority, 2571 Main Street Extension, Sayreville, New Jersey 08872. Attn: Judith McCrone. Notice of revisions or Addenda to advertisements or Bid documents will be noticed as outlined in N.J.S.A. 40A:11-23(c). The owner will transmit a notice of revisions or Addenda to advertisements or Bid documents no less than seven (7) working days prior to Bid opening as found in N.J.S.A. 40A:11-23(c).

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$18,122,000.00

Public - County

New Construction, Site Work

124

38

75

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Construction Progress Documentation, Construction Progress Reporting, Photographic Documentation, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Barricades, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Protection of Adjacent Construction, Execution, Application, Erection, Cleaning and Waste Management, Starting and Adjusting, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Roofing and Siding Panels, Metal Wall Panels
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment, Foodservice Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Projectors
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furnishings and Accessories
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding, Suspended Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Potable-Water Storage Tanks, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Vibration and Seismic Controls for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems, Identification for Communications Systems, Structured Cabling, Communications Backbone Cabling, Communications Copper Backbone Cabling, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Stripping and Stockpiling, Earth Moving, Grading, Rough Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Driven Piles, Timber Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Pruning, Watering, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Curbs and Gutters, Paving Specialties, Pavement Markings, Painted Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Fuel Distribution Utilities, Natural-Gas Distribution, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Hooks, Slings, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
559
Active Projects
321
Bidding Soon
5,028
All Active Projects
2,334
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

December 31, 2024

img_map_placeholder

2571 Main St. Ext, Sayreville, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construction of a Centralized Storage Facility at the Central Treatment Plant

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.