EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 4, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a civil project in Sayreville, New Jersey. Completed plans call for site work for a water / sewer project.

Bidders shall provide, at a minimum, all labor, equipment, tools, materials, supplies and manufactured articles necessary to execute various Work items as required by the Owner for the maintenance, repair and/or replacement of the Owner’s gravity sanitary sewer, siphons, manhole chambers and force mains throughout the collection system. The work shall include but not be limited to furnishing and installing rehabilitation of the Original Sayreville Pump Station Influent Chamber; and, furnishing and installing exterior manhole repairs and rehabilitation along the Sayreville Relief Force Main. Bids must be received by the Authority by no later than 10:00 AM on November 6, 2024 at which time they will be publicly opened and read aloud. A non-mandatory Pre-Bid meeting will be held at the Authority on October 23, 2024, at 9:30AM. This will be followed by a non-mandatory visit to the site. Attendance is highly encouraged. Notice Content MIDDLESEX COUNTY UTILITIES AUTHORITY CONTRACT 24-5-1(AC) INVITATION TO BID NOTICE IS HEREBY GIVEN that sealed Bids for Contract 24-5-1(AC) for STANDBY CONTRACT FOR FORCE MAINS AND GRAVITY SEWERS will be received by the Middlesex County Utilities Authority, County of Middlesex, State of New Jersey (the “Authority”), at its offices at 2571 Main Street Extension, Sayreville, New Jersey, 08872, on November 6, 2024 at 10:00 AM. Bidders shall provide, at a minimum, all labor, equipment, tools, materials, supplies and manufactured articles necessary to execute various Work items as required by the Owner for the maintenance, repair and/or replacement of the Owner's gravity sanitary sewer, siphons, manhole chambers and force mains throughout the collection system. The work shall include but not be limited to furnishing and installing rehabilitation of the Original Sayreville Pump Station Influent Chamber; and, furnishing and installing exterior manhole repairs and rehabilitation along the Sayreville Relief Force Main. Bids must be received by the Authority by no later than 10:00 AM on November 6, 2024 at which time they will be publicly opened and read aloud. A non-mandatory Pre-Bid meeting will be held at the Authority on October 23, 2024, at 9:30AM. This will be followed by a non-mandatory visit to the site. Attendance is highly encouraged. Further information concerning this procurement is provided in the RFB for such services. A copy of the RFB, which includes all forms, exhibits and appendices set forth herein, including the proposed Contract and Specifications and Scope of Work, shall be obtained only from the website at www.Bidset.com/MCUA. Bidders must purchase Bid packages through BidSet in order to be considered a Bidder. A $25 fee plus applicable tax/delivery charges will apply. The toll free telephone number for BidSet is 866-752-6766. The RFB may be viewed at www.Bidset.com/MCUA and at the Authority's offices at 2571 Main Street Extension, Sayreville, NJ 08872, prior to purchasing. The Authority will not be responsible for RFB documents obtained from other sources. No Bid will be accepted after the above referenced date and time. Any Bid received after the due date, whether by mail or otherwise, will be returned unopened. Each Bidder must submit with its Bid, Bid Security in the form of a Bid Bond executed by the Principal and Surety Company Attorney in Fact and witnessed to and attested with an appropriate Power of Attorney attached, or a cashier's check, or treasurer's check or certified check or money order made payable to the order of the Treasurer, Middlesex County Utilities Authority and in the amount of ten percent (10%) of the Bid price, not to exceed $20,000.00. In addition to the Bid Security, each Bid must be accompanied by a Consent of Surety written by a Surety Company listed on the Federal Treasury List (Environmental Protection Department Circular 570-Surety Companies Acceptable on Federal Bonds) as required by N.J.A.C. 7:22-3.17(g) and N.J.A.C. 7:22-4.17(g), and is licensed to do business in New Jersey and acceptable to the Authority, that in the event of an award of the Contract to the Bidder, said Surety will furnish the required contract bond(s) in the sum of the full amount of the Bid as set forth and as required in the RFB. The contract bond(s) for this RFB include the following and must be from a Surety Company acceptable to the Authority and satisfying the requirements of the RFB: - Performance and Payment Bond - General Maintenance Bond The Successful Bidder will be required to present to the Authority the approved contract bonds duly executed and be prepared to execute the Contract within twenty-one (21) days of the date of receipt of the Notice of Contract Award. All Bidders and named Subcontractors must possess current and effective Public Works Contractor Registration Certificates (PWCR) as of the Bid opening date. A Bidder who does not possess a valid PWCR as of the Bid opening date, or who names any Subcontractor in its Bid who does not possess a valid PWCR as of the Bid opening date, will be deemed ineligible for Contract award. Bidders are requested to submit copies of all applicable PWCR certificates with their Bids. If copies of any of these certificates are omitted from the Bid, they shall be provided to the Authority prior to award, and within five (5) business days of its request. The Authority shall have the right to independently verify Bidders' and named Subcontractors' PWCR status from computerized systems maintained by the State and shall be guided accordingly in its award process. Should the Successful Bidder fail or refuse to execute the Contract and/or submit any other required documents within the time period set forth in this RFB, the Authority shall have the right to consider the Successful Bidder to have abandoned the Contract and the Authority may proceed to award the Contract to the next lowest responsive and responsible Bidder or re-advertise same, whichever shall be determined to be in the Authority's best interest. Bids must be submitted in sealed envelopes with the name “MCUA: CONTRACT 24-5-1(AC)/ STANDBY CONTRACT FOR FORCE MAINS AND GRAVITY SEWERS” clearly marked on the outside of the envelope. Bids may not be e-mailed, faxed or transmitted over the telephone. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27, et seq., as amended and supplemented, Affirmative Action and Equal Employment Opportunities; N.J.S.A. 52:25-24.2, Ownership Disclosure Form, as amended and supplemented; N.J.S.A. 34:11-56.25 et seq., the New Jersey Prevailing Wage Act, the New Jersey Buy American provisions, N.J.S.A.52:32-1; and American with Disabilities Act of 1990 provisions of the Contract. Additionally, each Bidder shall submit a Certification on Non-Segregated Facilities. The Bidding and award of the Contract will be in compliance with the New Jersey Local Public Contracts Law (N.J.S.A. 40A:11-1 et seq.). Any questions regarding this RFB should be directed in writing to Judith McCrone at jmccrone@mcua.com, as set forth in the RFB. The Authority reserves the right to waive any minor informalities or reject any and all Bids in accordance with the Local Public Contracts Law, N.J.S.A. 40A:11-1 et seq., as well as any other applicable law. John F. Wiley, Esq. Chairman Middlesex County Utilities Authority Sayreville, New Jersey ($82.46)

Award

Water / Sewer

$8,979,877.00

Public - County

Site Work

23

14

9

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Rehabilitation of Cast-in-Place Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Exterior Protection
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding, Suspended Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Flexible Connectors
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geotechnical Instrumentation and Monitoring of Earthwork, Special Foundation and Load Bearing Elements Instrumentation and Monitoring, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Control Equipment
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
565
Active Projects
352
Bidding Soon
5,203
All Active Projects
2,245
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2024

January 6, 2025

img_map_placeholder

Multiple Locations, Sayreville, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Standby Contract for Force Mains and Gravity Sewers

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.