Published December 6, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in New City, New York. Completed plans call for the renovation of a municipal facility.

Reference Number 0000363797 This project is for the Cooling Tower replacement at the Rockland County Courthouse in New City NY. The existing cooling tower is approximately twenty-two years old and has reached the end of its useful life expectancy. However, this cooling tower is currently operational year-round and provides cooling throughout this facility. Equipment lead times are estimated to be approximately six months. Separate contracts will be issued for Electrical and Mechanical Construction. The awarded Mechanical Contractor shall be responsible for the rigging and replacement of all new equipment and the removal and disposal of this existing cooling tower. Delivery Point 1 South Main Street, New City, NY 10956 Question Deadline 10/24/2024 at 12:00 PM ET Questions are submitted online No. All Questions Pertaining to This Solicitation Must Be Submitted in Writing Questions Will Not Be Addressed Verbally Please Use This Form and Email to: Purchasing@co.rockland.ny.us Attention: Paul J. Brennan Director of Purchasing And Fmcapital@co.rockland.ny.us Attention: Robert H. Gruffi, P.e., Leed Ap Director, Facilities Management General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - FOB Destination - Installation Required - Insurance Required - Prevailing Wage Required - Warranty Information Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % -- The Bid security or deposit required to accompany this Bid is Ten Percent (10%) of the total Bid price in the form of a Certified Check or Bid Bond. The total Contract Time from the issuance of the Notice to Proceed until the total closeout of the project shall be 330 calendar days. The Contract Time to perform the construction work shall be 270 calendar days from the issuance of the Notice to Proceed to Substantial Completion.

Bid Results

Municipal

$527,000.00

Public - County

Renovation

14

10

2

7

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Spare Parts, Commissioning
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
535
Active Projects
314
Bidding Soon
5,096
All Active Projects
2,215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

November 29, 2024

img_map_placeholder

1 S Main St, New City, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Government Center Building Improvements Courthouse Cooling Tower Replacement - Mechanical

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.