Published November 4, 2024 at 7:00 PM

Updated December 21, 2024

Site work and renovation of a civil project in Lilesville, North Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of November 4, 2024, this project has not yet been awarded. The project is expected to be awarded on December 2025. The Anson County Water Treatment Plant Filter Rehabilitation Project is ~10M project, consisting of the complete rehabiliation of filters #5-8. In addition, there are two (2) Bid alternates for the Rehabilitation of filters 3 & 4, and 1 & 2. Base: Demolition and rehabilitation of Filters #5-8 including removal of all components withing the footprint of the filter, structural repairs, replacement of underdrain system, filter media, troughs, influent slide gates and associated piping modifications in the filter gallery. Modifications to the air piping, replacement of pneumatic valves and gates to electric actuators. Installation of a settled water interconnection between the filter water flume on Filter #1-4 and #5-8. New blower package and related electrical and I&C. I&C to be performed by CITI. Alternate 1: Demolition and rehabilitation of filters #3-4 (same scope as above including piping and actuator swap out). Installation of new filter control panels. Miscellaneous demolition of existing plant infrastructure. Associated programing by CITI. Alternate 2: Demolition and rehabilitation of filters #1-2 (same scope as above including piping and actuator swap out). Installation of new filter control panels. Miscellaneous demolition of existing plant infrastructure. Associated programing by CITI. Demolition of the dividing wall in the filter gallery influent flume between filter 2 and 3. Please refer to the specifications for detailed scope of work and sole sourced/approved manufacturers. EPA MBE/WBE participation goals: MBE 10.9% WBE 10.4% State of NC MBE/WBE participation goal: 10% (combined) Question Deadline 10/16/2024 All questions about the meaning or intent of the Bidding Documents shall be submitted to Engineer in writing. To receive consideration, questions must be received by Engineer at least seven (7) calendar days prior to the date for the opening of Bids.

Bid Results

Water / Sewer

$3,694,200.00

Public - County

Renovation, Site Work

129

28

27

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

December 23, 2024

Project location map

567 Filtration Rd, Lilesville, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.