BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2024 at 7:00 PM

Updated December 12, 2024

Site work and paving for a civil project in Schiller Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Kelvin Lane Storm Sewer Improvements. The Scope of Work Includes the Installation of New Storm Sewer and Drainage Structures, Minor Water Main Improvements, Structure Adjustments, Pavement Patching, Hot Mix Asphalt Surface Installation, and Restoration Work. All Bid Proposals Offered Must Be Accompanied by a Bid Bond, Cashier's Check, or Certified Check Payable to the Village of Schiller Park in an Amount Which Shall Not Be Less Than Ten Percent (10%) of the Total Amount of the Bid, as a Guarantee That if the Bid is Accepted by the Village, a Contract Will Be Entered Into With the Village. No Bid Proposal Shall Be Considered Unless Accompanied by Such a Bid Bond or Check. No Bid Shall Be Withdrawn After the Opening of the Proposals Without the Consent of the President and Board of Trustees of the Village of Schiller Park for a Period of Sixty (60) Days After the Scheduled Time of Bid Opening. The Contractor and Subcontractor Shall Comply With All Regulations Issued Pursuant to Prevailing Wage Act (820 Ilcs 130), and Other Applicable Federal Laws and Regulations Pertaining to Labor Standards. The Village of Schiller Park Reserves the Right to Determine the Lowest, Responsive, and Responsible Bidder, to Waive Irregularities and to Reject Any or All Bid Proposals.

Award

Roads / Highways

$795,486.00

Public - City

Paving, Site Work

13

5

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
482
Active Projects
264
Bidding Soon
3,495
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2024

November 13, 2024

Project location map

Kelvin Ln, Schiller Park, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.