BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Schiller Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Kelvin Lane Storm Sewer Improvements. The Scope of Work Includes the Installation of New Storm Sewer and Drainage Structures, Minor Water Main Improvements, Structure Adjustments, Pavement Patching, Hot Mix Asphalt Surface Installation, and Restoration Work. All Bid Proposals Offered Must Be Accompanied by a Bid Bond, Cashier's Check, or Certified Check Payable to the Village of Schiller Park in an Amount Which Shall Not Be Less Than Ten Percent (10%) of the Total Amount of the Bid, as a Guarantee That if the Bid is Accepted by the Village, a Contract Will Be Entered Into With the Village. No Bid Proposal Shall Be Considered Unless Accompanied by Such a Bid Bond or Check. No Bid Shall Be Withdrawn After the Opening of the Proposals Without the Consent of the President and Board of Trustees of the Village of Schiller Park for a Period of Sixty (60) Days After the Scheduled Time of Bid Opening. The Contractor and Subcontractor Shall Comply With All Regulations Issued Pursuant to Prevailing Wage Act (820 Ilcs 130), and Other Applicable Federal Laws and Regulations Pertaining to Labor Standards. The Village of Schiller Park Reserves the Right to Determine the Lowest, Responsive, and Responsible Bidder, to Waive Irregularities and to Reject Any or All Bid Proposals.

Bid Results

Roads / Highways

$795,486.00

Public - City

Paving, Site Work

13

5

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
98
Bidding Soon
1,827
All Active Projects
840
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2024

November 13, 2024

img_map_placeholder

Kelvin Ln, Schiller Park, IL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.