BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 30, 2024 at 7:00 PM

Updated December 31, 2024

Demolition, site work, renovation and addition to an educational facility in Oak Lawn, Illinois. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The scope of this project includes, but is not limited to, the following: demolition, site work, renovation and addition to an educational facility. As of December 30, 2024, a construction manager has been selected for this project. A firm costructio timeline for this project has not yet been released. ALL BIDDERS: Oak Lawn Community High School District 229 will receive separate sealed bids for each of the following bid packages: Bid Package 2A- Demolition Bid Package 9B - Resinous Flooring Bid Package 3A- Concrete Bid Package 9C - Sports Flooring Bid Package 3B - Precast Panels Bid Package 21A - Fire Sprinkler Bid Package 4A - Masonry Bid Package 22A - Plumbing Bid Package 5A - Structural Steel Bid Package 23A - HVAC/Mechanical Bid Package 6A - General Trades Bid Package 26A - Electrical Bid Package 7A - Roofing & Sheet Metal Bid Package 31A - Site Excavation/Site Utilities Bid Package 8A - Aluminum Storefront/Glazing Bid Package 32A - Asphalt Bid Package 9A - Painting All interested bidders for the 2025 Fieldhouse and Interior Remodeling project at Oak Lawn Community High School must demonstrate previous experience with State of Illinois School projects, complete and file with the Architect a confidential AIA-A305 Contractor's Qualification Statement. The Qualification Statement must be reviewed by the Architect before bid documents can be obtained. Please send your completed AIA-305 to: Jon Murawski, AIA at j.murawski@dla-ltd.com. The project includes, but is not limited to, the following: select interior demolition and new construction of fieldhouse and ancillary spaces. New and modified HVAC, electrical, plumbing and fire protection equipment. Refer to the Project Manual Specifications and Drawings for the full extent of the Work that will be required. A Bid Security of 10% of the Bid Package is required with the bid proposal. The Contractor must pay the Prevailing Wage Rates for all work per Illinois Law. The Owner reserves the right to reject any or all bids, to waive irregularities in the bidding procedure, or accept the Bid that, in its opinion, will serve the best interest of the Owner. Any such decision shall be considered final. The Owner reserves the right to set aside a Bid from a Contractor who, in the Owner's opinion, does not exhibit past experience equal to the size and scope of this project. Submitted info : Bids should be submitted in person to Joseph McCurdy, Assistant Superintendent/CSBO, Oak Lawn Community High School, District Office, 9400 Southwest Highway, Oak Lawn, IL 60453-2396. Bids will be time stamped upon arrival.

Post-Bid

Educational

$1,500,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
249
Bidding Soon
3,298
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2024

February 24, 2025

Project location map

Multiple Locations, Oak Lawn, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.