BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 14, 2024 at 8:00 PM

Updated November 1, 2024

Remodeling and renovation of a municipal facility in Tumwater, Washington. Completed plans call for the remodel of a 16,000-square-foot municipal facility.

The work includes, but is not limited to, the following: Remodel and expand the current Thurston County Ballot Processing Center located at 2905 29th Ave SW Tumwater. The current space at the Ballot Processing Center does not meet the current or future space and security needs of the Thurston County Auditors Election Division. The remodel will utilize the entire building and provide approximately 16,000 SQ. feet of space. The existing Ballot Processing Center is operational and occupied so the construction schedule must be done utilizing a phased approach to minimize adverse impact on the tenants and operations.

Post-Bid

Municipal

$5,000,000.00

Public - County

Remodeling, Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
91
Bidding Soon
1,425
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.