BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Farmington, New Mexico. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

The Project consists of constructing the demolition and construction of a bridge crossing the Jones Arroyo, roadway improvements, signing, striping, grading, riprap, and other work as indicated in the bid tab. Bids will be received for a single prime Contract. Bids shall be on a unit price basis, as indicated in the Bid Form. Bid security shall be furnished in accordance with the Instructions to Bidders. Bidders shall be licensed as Contractors in the State of New Mexico at the time of Bid submittal and must include their license number and Contractor classifications held in the prescribed place on the bid form. Questions regarding the bidding documents shall be submitted through T.Y. Lin International, 500 4 th Street NW, Suite 403F, Albuquerque, NM 87102 or howard.cake@tylin.com Attention: Howard Cake, P.E. The last day for questions is close of business (5:00 pm local time) November 11, 2024. San Juan County reserves the right to issue addenda to the Specifications during the advertising period as provided in the Contract Documents. A distribution list of those who receive the RFB and all Addenda will be maintained throughout the procurement process and will become part of the procurement file.

GC Bidding

Bridges / Tunnels

$2,200,000.00

Public - County

Demolition, New Construction, Paving, Site Work

23

11

4

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
57
All Active Projects
26
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2024

January 20, 2025

img_map_placeholder

County Rd 3000, Farmington, NM

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.