BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated December 10, 2025

Site work, paving and new construction of a power facility in Nipomo, California. Completed plans call for the construction of a power facility; and for site work for a power facility.

The Project will construct a new Sheriff's Nipomo Substation for the County of San Luis Obispo. The objective of this project is to provide the Sheriff's Office with a high quality, state of the art essential services facility to service south San Luis Obispo County for the next fifty (50) years. As the community of Nipomo continues to grow there is a corresponding need for an increase in emergency services infrastructure in southern San Luis Obispo County D-BE's shall be fully knowledgeable of and shall be required to comply with all applicable State prevailing wage requirements and/or regulations. Copies of the general prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Contract, as determined by Director of the State of California Department of Industrial Relations (DIR). State prevailing wage requirements are published by the Director of the State of California Department of Industrial Relations. D-BE agrees that the Payment Bond, Performance Bond and Maintenance Bond attached to this Agreement are for reference purposes only, and shall not be considered a part of this Agreement or any other Contract Document. D-BE further agrees that said bonds are separate obligations of the D-BE and its surety, and that any attorney's fee provision contained in any payment bond or performance bond shall not apply to any legal action between D-BE and County to enforce any provision of the Contract Documents. Section 00 60 00 Bond Requirements and Forms, and Guarantees: To be executed by successful D-BE and surety, in the amount of 100% of the Contract Price. Submit three (3) copies, each bearing all required original signatures The County reserves the right to modify this RFP and any existing procedures and/or establish additional procedures for the Proposal selection process. Any modification or addition to procedures will be done via addendum with all the Proposers being notified if County exercises this right QA date - 11-3-2025 5:00 PM Any questions or requests for clarification that cannot be uploaded or submitted via the online, shall be directed to: Missy Viles Central Services Purchasing Division 1087 Santa Rosa Street San Luis Obispo, CA 93408 mviles@co.slo.ca.us

Post-Bid

Power Plant

$8,000,000.00

Public - County

New Construction, Paving, Site Work

4

68

21

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
20
Bidding Soon
507
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2025

April 6, 2026

Project location map

W Tefft St & Carrillo St, Nipomo, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.