BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Site work for a power facility in Fort Peck, Montana. Completed plans call for site work for a power facility.

AMENDMENT 0002 PLUS AMENDMENT NARRATIVE, AM0002 01 12 00 FP PH1 SURGE TANK SPECS, AND AM0002 W9128F25BA002 4 OF 4 FP PH1 SURGE TANK REPAIR REFERENCE DRAWINGS ARE POSTED IN THE ATTACHMENT SECTION OF THIS SOLICITATION. ACKNOWLEDGEMENT OF ALL AMENDMENTS MUST BE PROVIDED WHEN SENDING IN STEP ONE AND STEP TWO OF THE OFFER. AMENDMENT 0002 TO EXTEND THE SOLICITATION DUE DATE FROM 5 JUNE 2025 12 JUNE 2025 WILL BE POSTED TOMORROW MORNING. This SOLICITATION is for W9128F25BA002. The U.S. Army Corps of Engineers, Omaha District intends to issue a Two-Step IFB solicitation for "Fort Peck PH 1 Surge Tank Roof Replacement". The solicitation will close on or about 5 June 2024 by 2:00 PM CT. Step-One will be for the Technical only. NO pricing information will be provided during the Step-One process. DESCRIPTION OF WORK: The Surge Tank roof of the Ft. Peck Powerhouse, constructed in the 1940s, requires restoration to its original design in compliance with Montana State Historical Preservation Office (SHPO) regulations. The project involves the complete removal of existing roofing layers, including felt and Ludowici Provincial clay tile shingles, and the replacement with new Ludowici tiles that match the original materials to ensure historical accuracy. The roof, situated 272.48 feet above grade with an 8:12 slope and spanning 40 feet in diameter (2,500 square feet), currently features original clay tiles, 15-pound asphalt-impregnated waterproof felt with coal-tar pitch, and 2 1/2 " nailable precast concrete roof slabs secured with copper nails. The restoration will replace the clay tiles, copper flashings, and potentially the asphaltic waterproofing, while preserving the structural integrity of the precast concrete panels and maintaining the historical character of the Ft. Peck Dam. Comprehensive documentation will be kept throughout the project to track all aspects of the restoration and ensure adherence to historical preservation standards. Site Visit: A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation. Site Visit Date, Time and location is listed under FAR 52.236-27. Please respond to Mr. Zachary Watts your intent to attend the site visit. MAGNITUDE OF CONSTRUCTION: The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. Place of Performance: Fort Peck Dam, Valley County, Montana Contracting Office Address: USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901 Point Of Contact: All questions regarding this pre-solicitation should be made to the Contract Specialist, Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database (https://sam.gov) exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov. Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendment current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update. Lynne Reed, who can be reached by email: lynne.d.reed@usace.army.mil. . The contractor shall begin performance within 10 calendar days and complete it within 650 calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Power Plant

$696,363.00

Public - Federal

Site Work

18

12

13

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
2
Bidding Soon
16
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

August 27, 2025

Project location map

To Be Determined, Fort Peck, MT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.