BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2025 at 8:00 PM

Updated October 23, 2025

Renovation of a power facility in Fort Peck, Montana. Completed plans call for the renovation of a power facility.

UPDATE: Amendment 0001 was issued on 31 July 2025. Please see four (4) corresponding documents. Original Solicitation issued on 21 July 2025. Project Title: Powerhouse 1 Cubicle Room 15kv Switchgear Upgrade, Fort Peck, Montana Project Location: Fort Peck Dam, The Existing 15 Kv Switchgear Located in the Cubicle Room at Elevation 2071 Will Be Replaced With a New 15kv Switchgear Lineup That Will Include the Generator and Tie Breakers Located in the Cubicle Room, and New 15kv Outdoor Circuit Breakers Located in the Switchyard. The New System Still Maintains Current System Flexibility by the Addition of Bus Tie Breakers in Addition, the Scope Will Also Include the Installation of Two New 15kv, 12mva Reactors, the Replacement of the Cable Trays in the Cable Tunnel, the Replacement in Kind of the Lighting Distribution Panelboards and Dry-type Transformers in the Switchyard, the Installation of Warning Lights at the Three Entrance Points to the Cubicle Room, and an Evaluation of the Existing Lighting System in the Cubicle Room. The Contractor Shall Begin Performance Within 30 Calendar Days and Complete It Within 950 Calendar Days Solicitation questions and/or comments must be submitted via Bidder Inquiry in ProjNet at: https://www.projnet.org/projnet/. All Bidder Inquiries Question Deadline 09/26/2025 All Bidder Inquiries must be submitted no later than ten (10) calendar days before the proposal due date in order for inquiries to be given consideration or actions taken prior to the receipt of offers. . Inquiries considered proprietary by the prospective vendor may also be submitted via email. Contract Specialist - Primary POC: Margarette Wolfe Margarette.E.Wolfe@usace.army.mil Contracting Officer- Secondary POC: Daniel D. Monahan Daniel.D.Monahan@usace.army.mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Hydroelectric Power Generation

$10,000,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
9
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2025

December 22, 2025

Project location map

215 Yellowstone Rd, Fort Peck, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.