Published November 21, 2024 at 7:00 PM

Updated October 1, 2024

Site work and new construction of an educational facility in Stillwater, Oklahoma. Completed plans call for the construction of a 35,240-square-foot, one-story above grade educational facility; and for site work for a educational facility.

*Sealed Bids will be received for BP6 Metal Panels no later than 2:00 P.M. on Tuesday, December 10, 2024, at Willowbrook, 620 NE 36th St., OKC, OK 73105. A. The General Conditions, Supplementary Conditions, and Division 1 are hereby made a part of each of the technical sections that follow and shall be understood to apply and shall apply in full to all individuals or corporations who contract or subcontract to perform any part or all the project work. B. Indications on the Drawings or in any section of the Specifications of an article or material, operation, or method, requires that the Contractor shall provide each item or service, or quality, or is subject to qualifications noted and the Contractor shall perform each operation prescribed according to the conditions stated providing, therefore, all necessary labor, equipment, and incidentals to complete the project work. C. The following is the SCOPE OF WORK to be performed by each Contractor for each Bid Package. All Contractors shall coordinate with each trade the exact location of existing equipment, piping, etc., before any work begins. This summary of work in no way limits the Contractor's responsibility to provide fully operational facilities as shown on the Drawings and specified herein Singled-story classroom wing addition to the SPS High School. Phase 1 currently under construction.

Post-Bid

Educational

$6,573,000.00

Public - City

New Construction, Site Work

80

27

42

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchorage and Reinforcing, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Glass Unit Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roofing and Siding Panels, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
55
Bidding Soon
723
All Active Projects
330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2024

December 30, 2024

img_map_placeholder

314 S Lewis St, Stillwater, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Stillwater Public Schools High School, Phase 2 PA Wing - Rebid Bid Package 6 Metal Panels Only

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.