Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 22, 2024 at 8:00 PM
Updated November 9, 2024
Renovation of an educational facility in Stillwater, Oklahoma. Completed plans call for the renovation of a educational facility.
Project Description: Buildout offices on the 4th floor of Engineering South List of Primary Bid Packages contained in this Solicitation for Bid Bid Package 1 - Mechanical Bid Package 2 - Sound Panels No bids may be withdrawn after the scheduled opening of bids for a period of at least thirty (30) days. The Owner reserves the right to accept or reject any or all bids and waive any minor informality Construction is expected to take place in November and December 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Post-Bid
Educational
$100,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 8, 2024
November 25, 2024
124 N Hester St, Stillwater, OK
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
