BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2025 at 8:00 PM

Updated July 30, 2025

Site work for a civil project in Lauderhill, Florida. Completed plans call for site work for a water / sewer project.

**As of July 23,2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The City of Lauderhill Public Works Department is seeking proposals from a General Contractor for the rehabilitation of Lift Station No. 5. The rehabilitation consists of converting the current dry/wet well configuration into a submersible pump station. This upgrade includes converting the existing 6-feet diameter wet well into the new receiving manhole, partially demolish the existing dry well, the installation of a new valve vault with 6-inch discharge piping and a new 8-feet ID wet well, as well as the installation of a new control panel and electrical equipment. This upgrade will improve the reliability, operability, efficiency, and safety of Lift Station No. 5 and will extend the useful life of the station. The lift station No.5 is located on the north side of NW 16th Street, approximately 430 linear feet east from the NW 38th Avenue. All bidders must register online with the City of Lauderhill. Responsible questions regarding this BID offering may be submitted via online . The last date for questions pertaining to this proposal is ten days before the due date. Questions after this date will not be answered Question Cut Off Date: 5/20/2025 05:00 PM (ET) This upgrade includes: Converting the existing 6-feet diameter wet well into a new receiving manhole. Partially demolishing the existing dry well. Installing a new valve vault with 6-inch discharge piping. Installing a new 8-feet ID wet well. Installing a new control panel and electrical equipment. This upgrade will improve the reliability, operability, efficiency, and safety of Lift Station No. 5 and will extend the useful life of the station. The Lift Station No. 5 is located on the north side of NW 16th Street, approximately 430 linear feet east from the NW 38th Avenue. 1. Furnish and install a bypass pumping system as per the specifications. 2. Demolish and remove existing concrete structures as detailed in the plans, including the concrete slab and hatches, demolition of the existing dry well and wet well, vent system, piping inside the wet well, piping, valves, pumps, and appurtenances inside the dry well, removal of approximately 37 LF of 6-inch DIP force main, demolishing existing electrical equipment as indicated on electrical drawings, and any other appurtenant and miscellaneous work necessary for a complete, satisfactory, and functional demolition. 3. Remove and relocate the existing fire hydrant as shown on the plans. 4. Convert the existing 6-foot wet well into the new receiving manhole. 5. Furnish and install a new 8-foot ID wet well to house two (2) new submersible pumps. 6. Furnish and install the wet well top slab and hatches. 7. Furnish and install two (2) new submersible pumps, Flygt NP3153 HT-3 (463) with unclog impeller diameter 263 mm and 20 horsepower motors at 1,755 rpm, or an approved equal. 8. Furnish and install a new valve vault with 6-inch piping. 9. Furnish and install the valve vault top slab and hatches. 10. Furnish and install 6-inch discharge piping in the wet well to connect to the proposed valve vault. 11. Furnish and install approximately 30 LF of 6-inch DIP force main. 12. Construct the proposed asphalt driveway and concrete slabs as shown on the plans. 13. Restore asphalt pavement as shown on the plans. 14. Furnish and install a proposed picket fence around the station property. 15. Remove existing electrical service, electrical distribution, station controls, and low-voltage systems. 16. Abandon all above-ground infrastructure in place; remove all underground conduits. 17. Furnish and install all new electrical equipment as indicated on the plans. 18. The contractor shall apply for and obtain all permits required for construction of the project. 19. Preparation of the NPDES plan and permit is required, and it must be maintained throughout the entire construction period. 20. A Maintenance of Traffic (MOT) plan and its implementation are required to provide 24-hour access for all traffic along NW 16th Street. 21. All permitting and approvals are with the City of Lauderhill.

Bid Results

Water / Sewer

$2,289,850.00

Public - City

Site Work

27

14

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
115
Bidding Soon
1,786
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

July 29, 2025

Project location map

3759 NW 16th St, Lauderhill, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.