BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a water / sewer project in Cleveland, Ohio. Completed plans call for the renovation of a water / sewer project.

In General, the Work Shall Consist of Furnishing All Labor, Materials, Equipment, and Incidentals for Construction of the Following Work: This Project Will Replace or Install Fire Alarm and Fire Suppression Systems at Southerly Wastewater Treatment Center, Environmental &maintenance Services Center (Emsc), Westerly Wastewater Treatment Center and George J. Mcmonagle (Gjm) Administration Building. This Will Include the Following: Southerly Wwtc 1) Provide and Install a Total and Complete New Addressable Horn-strobe Fire Alarm System for Substations 04, 09, 11, 12 & 20, 13, 14, 15, 18, and 19 Coordinated With Previous Site Networking Upgrades to Create a Dedicated Fire Alarm Fiber Network for All Buildings With Fire Alarm Systems to Report to Southerly Security. 2) Provide and Install Duct Detection and Ahu Shut Down for Building 30. 3) Provide and Install Tamper and Flow Switches on the Sprinkler Riser in Building 95 and Monitor With the Existing Fire Alarm System. Gjm 1) Replace the Existing Simplex Fire Alarm System With a New Notifier Fire Alarm System. Devices Shall Be a 1 for 1 Replacement Except Where Coverage is Less Than That Required by Code. 2) Provide New Horn Strobes on Buildings Exterior Adjacent to the 3 Main Entrances. 3) Add New Card Readers & Door Hardware. Existing Doors/readers to Be Activated. Refer to Plans and Door Schedule for Locations. 4) Install Ada Compliant Power Assisted Door Operators With Door Actuators on Each Side of Opening. Refer to Plans and Door Schedule for Locations. Emsc 1) Provide and Install a Complete Fm-200 Clean Agent System Inclusive of Room Integrity Modifications for the Basement Server Room. 2) Monitor by the Existing Building for Alarm. 3) Add New Card Readers & Door Hardware. Existing Doors/readers to Be Activated. Refer to Plans and Door Schedule for Locations. 4) Install Ada Compliant Power Assisted Door Operators With Door Actuators on Each Side of Opening. Prospective Bidders Are Strongly Encouraged to Frequently Monitor the Bids Website for Project Updates and Addenda. The Neorsd Will Not Be Responsible or Liable for Project Addenda That Are Not Received by the Bidder Due to Incorrect or Out-of-date Contact Information. The Neorsd Reserves the Right to Reject Any and All Bids, and to Waive Any Informalities or Irregularities in the Bids Received. Bidders Shall Review the Instructions to Bidders and All Other Contract Documents Prior to Submitting a Bid for This Project. The Contract Will Be Subject to the Neorsd Policies and Goals Regarding the Use of Minority and Women Business Enterprises (Mbe/wbe) This Policy is Contained in the Contract Specifications. The Mbe/wbe Goal for This Contract is 20%. Estimate of Probable Construction Cost District Wide Fire Alarm and Security Upgrades.is $1,500,000.00. For This Project, Neorsd Will Not Award a Contract for Any Bid in Excess of Twenty Percent (20%) Above the Estimate of Probable Construction Cost. All Questions Regarding the Contract Documents Shall Be Directed to the Project Manager for the Neorsd, Dan Pacek at (216) 881-6600 or E-mail Pacekd@neorsd.or Any additional questions pertaining to the Bid Documents should be submitted in writing to Dan Pacek, at PacekD@neorsd.org and Robin Rupe, at RupeR@neorsd.org. The last day for questions is TUESDAY, NOVEMBER 5, 2024 by 3:00 PM (local/EST)

Bid Results

Water / Sewer

$1,582,110.00

Public - State/Provincial

Renovation

88

31

12

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
88
Bidding Soon
1,016
All Active Projects
398
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2024

January 20, 2025

img_map_placeholder

Multiple Locations, Cleveland, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.