BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a clubhouse / community center in Inuvik, Northwest Territories. Completed plans call for the construction of a 29,450-square-foot, two-story above grade clubhouse / community center; for site work for a clubhouse / community center; 29,159-square-foot, two-story above grade clubhouse / community center; and 20,161-square-foot, two-story above grade clubhouse / community center.

The scope of services required by IRC and Reimagine Architects for this Project includes, but is not limited to, the following: Pre-Construction Services: Review and provide feedback on preliminary design, construction feasibility, scheduling, and cost estimates. Assist in the development of construction phasing plans, value engineering, and risk analysis. Construction Phase Services: Coordinate and manage all on-site construction activities, including site safety, subcontractor management, quality control, schedule adherence, and cost management. Ensure compliance with all relevant codes and standards. Post-Construction Services: Oversee project closeout activities, including final inspections, commissioning, and the resolution of any deficiencies. Ensure that all required documentation, including as-built drawings and operation manuals, is completed and handed over to the IRC. Warranty Services: Ensure all contractual warranty work is executed in a timely manner in compliance with the project specifications. The selected Construction Manager will be required to work closely with Reimagine Architects, IRC, and other stakeholders to ensure that the Project is delivered on time, within budget, and to the specified quality standards. The Construction Manager shall attend all project meetings, provide regular progress reports, and maintain open and effective communication with all project stakeholders throughout the duration of the Project. Aklavik Community Building Paulatuk Community Building Ulukhaktok Community Building Official bid documents must be obtained from www.merx.com

Post-Bid

Clubhouse / Community Centers

$20,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
10
All Active Projects
4
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

August 1, 2025

img_map_placeholder

Multiple Locations, Inuvik, NT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.