Site work for a water / sewer project in Redstone Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

Redstone Township Sewer Authority Phase III Sewer Project Contrac The Project Includes the Following Work: the Project is Located in the Villages of Orient, Filbert, Fairbank, Herbert, Tower Hill and Thompson in Redstone Township, Fayette County, Pa and Consists of the Installation of Approximately Sixty-six Thousand, (66,000) Lineal Feet of 8-inch and 12-inch Gravity Sanitary Sewer Collection and Conveyance Facilities to Include Approximately Three Hundred and Fifty (350) Sanitary Manholes, Four (4) New Wastewater Pumping Stations With Approximately Fifteen Thousand (15,000) Lineal Feet of Force Main, an Expansion/upgrade of the Existing Redstone Township Sewer Authority Wastewater Treatment Plant (Located Along Dunlap Creek), and All Associated Restoration Work on Driveways, Roadways and Yards. The Project Will Be Separated Into Six (6) Separate Contracts as Listed in Section 01 12 50 - Summary of Multiple Contracts. Separate Bids Will Be Received for the Following Contracts: Contract No. Description of Contract 1 Redstone Township Sewer Authority Phase Iii Sewer Project Contract #1 Thompson #1 and Tower Hill Sewer Line and Force Main Installation (23,102 Gravity Line and 7,604 Force Main) 2 Redstone Township Sewer Authority Phase Iii Sewer Project Contract #2 Herbert and Fairbank Sewer Line Installation (18,464 Gravity Line) 3 Redstone Township Sewer Authority Phase Iii Sewer Project Contract #3 Filbert Sewer Line and Force Main Installation (16,397' Gravity Line and 665' Force Main) 4 Redstone Township Sewer Authority Phase Iii Sewer Project Contract #4 Orient Sewer Line and Force Main Installation (5,088 Gravity Line and 6,285 Force Main) 5 Redstone Township Sewer Authority Phase Iii Sewer Project Contract #5 Wastewater Treatment Plant (Wwtp) Upgrades (One 41' Dia. Sbr Tank) 6 Redstone Township Sewer Authority Phase Iii Sewer Project Contract #6 Pump Stations (4 Pump Stations) This Project Will Be Funded in Part With Funds Provided by the United States Department of Agriculture, Rural Utilities Service (Rus). Instructions to Bidders for All Further Requirements Regarding Bid Submittal, Qualifications, Procedures, and Contract Award, Refer to the Instructions to Bidders That Are Included in the Bidding Documents. American Iron and Steel Section 746 of Title Vii of the Consolidated Appropriations Act of 2017 (Division a - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and Subsequent Statutes Mandating Domestic Preference Applies an American Iron and Steel Requirement to This Project. All Iron and Steel Products Used in This Project Must Be Produced in the United States. The Term Iron and Steel Products Means the Following Products Made Primarily of Iron or Steel: Lined or Unlined Pipes and Fittings, Manhole Covers and Other Municipal Castings, Hydrants, Tanks, Flanges, Pipe Clamps and Restraints, Valves, Structural Steel, Reinforced Precast Concrete, and Construction Materials. Question Deadline 11/07/2024 Contact information and submittal procedures for such questions are as follows: Brian Lake, P.E., K2 Engineering, Inc. Email: brianlake@k2engineering.net Phone: (724) 439-3440 x 116 Document notes. Partial Sets of Bidding Documents Will Not Be Available Bidding Documents Can Be Purchased During the Specified Hours. Shipping Costs Are Not Included in the Purchase Price. Upon Receipt of Payment, Printed and/or Electronic Bidding Documents Will Be Sent Using the Bidders Chosen Delivery Service. Shipping Charges Will Vary Based on the Delivery Method Selected. Bidding Documents Are Available for Purchase in the Following Formats: Format Cost Project Drawings (Includes Full or Half-size Drawings) $50/per Contract Electronic Download of Project Drawings (Pdf) $25/per Contract Project Manual, Electronic Copy Only Provided With Either Option Above Note: All Fees Are Non-refundable. Bid Documents Are Comprised of the Project Drawings and the Project Manual for Each Contract. Make Checks for Bidding Documents Payable to K2 Engineering, Inc. CONTRACT #1 THOMPSON #1 / TOWER HILL CONTRACT #2 HERBERT / FAIRBANK CONTRACT #3 FILBERT CONTRACT #4 ORIENT

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

236

60

11

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
29
Bidding Soon
653
All Active Projects
243
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

December 16, 2024

img_map_placeholder

Multiple Locations, Redstone Township, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.