Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 3, 2025 at 7:00 PM
Updated August 7, 2025
Site work for a water / sewer project in Redstone Township, Pennsylvania. Completed plans call for site work for a water / sewer project.
As of January 3, 2025, this project has not yet been awarded. A timeline for award has not yet been established. As of November 21, 2024, the apparent low bidders are as follows: Contracts #1 through #4: Lump sum bid from Pollard Land Services. Contract #5: Bid from Global Heavy Corporation. Contract #6: Bid from Konzel Construction Co. Redstone Township Sewer Authority Phase III Sewer Project Contrac The Project Includes the Following Work: the Project is Located in the Villages of Orient, Filbert, Fairbank, Herbert, Tower Hill and Thompson in Redstone Township, Fayette County, Pa and Consists of the Installation of Approximately Sixty-six Thousand, (66,000) Lineal Feet of 8-inch and 12-inch Gravity Sanitary Sewer Collection and Conveyance Facilities to Include Approximately Three Hundred and Fifty (350) Sanitary Manholes, Four (4) New Wastewater Pumping Stations With Approximately Fifteen Thousand (15,000) Lineal Feet of Force Main, an Expansion/upgrade of the Existing Redstone Township Sewer Authority Wastewater Treatment Plant (Located Along Dunlap Creek), and All Associated Restoration Work on Driveways, Roadways and Yards. The Project Will Be Separated Into Six (6) Separate Contracts as Listed in Section 01 12 50 - Summary of Multiple Contracts. Separate Bids Will Be Received for the Following Contracts: Contract No. Description of Contract 1 Redstone Township Sewer Authority Phase Iii Sewer Project Contract #1 Thompson #1 and Tower Hill Sewer Line and Force Main Installation (23,102 Gravity Line and 7,604 Force Main) 2 Redstone Township Sewer Authority Phase Iii Sewer Project Contract #2 Herbert and Fairbank Sewer Line Installation (18,464 Gravity Line) 3 Redstone Township Sewer Authority Phase Iii Sewer Project Contract #3 Filbert Sewer Line and Force Main Installation (16,397' Gravity Line and 665' Force Main) 4 Redstone Township Sewer Authority Phase Iii Sewer Project Contract #4 Orient Sewer Line and Force Main Installation (5,088 Gravity Line and 6,285 Force Main) 5 Redstone Township Sewer Authority Phase Iii Sewer Project Contract #5 Wastewater Treatment Plant (Wwtp) Upgrades (One 41' Dia. Sbr Tank) 6 Redstone Township Sewer Authority Phase Iii Sewer Project Contract #6 Pump Stations (4 Pump Stations) This Project Will Be Funded in Part With Funds Provided by the United States Department of Agriculture, Rural Utilities Service (Rus). Instructions to Bidders for All Further Requirements Regarding Bid Submittal, Qualifications, Procedures, and Contract Award, Refer to the Instructions to Bidders That Are Included in the Bidding Documents. American Iron and Steel Section 746 of Title Vii of the Consolidated Appropriations Act of 2017 (Division a - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and Subsequent Statutes Mandating Domestic Preference Applies an American Iron and Steel Requirement to This Project. All Iron and Steel Products Used in This Project Must Be Produced in the United States. The Term Iron and Steel Products Means the Following Products Made Primarily of Iron or Steel: Lined or Unlined Pipes and Fittings, Manhole Covers and Other Municipal Castings, Hydrants, Tanks, Flanges, Pipe Clamps and Restraints, Valves, Structural Steel, Reinforced Precast Concrete, and Construction Materials. Question Deadline 11/07/2024 Contact information and submittal procedures for such questions are as follows: Brian Lake, P.E., K2 Engineering, Inc. Email: brianlake@k2engineering.net Phone: (724) 439-3440 x 116 Document notes. Partial Sets of Bidding Documents Will Not Be Available Bidding Documents Can Be Purchased During the Specified Hours. Shipping Costs Are Not Included in the Purchase Price. Upon Receipt of Payment, Printed and/or Electronic Bidding Documents Will Be Sent Using the Bidders Chosen Delivery Service. Shipping Charges Will Vary Based on the Delivery Method Selected. Bidding Documents Are Available for Purchase in the Following Formats: Format Cost Project Drawings (Includes Full or Half-size Drawings) $50/per Contract Electronic Download of Project Drawings (Pdf) $25/per Contract Project Manual, Electronic Copy Only Provided With Either Option Above Note: All Fees Are Non-refundable. Bid Documents Are Comprised of the Project Drawings and the Project Manual for Each Contract. Make Checks for Bidding Documents Payable to K2 Engineering, Inc. CONTRACT #1 THOMPSON #1 / TOWER HILL CONTRACT #2 HERBERT / FAIRBANK CONTRACT #3 FILBERT CONTRACT #4 ORIENT Bid-Results:- 1. Contract #1 Thru #4- Pollard Land Services Inc.-$ 11,157,053 2. Contract #1 - Thompson #1 - Pollard Land Services Inc.-$ 3,768,032. 3. Contract #2-Pollard Land Services Inc.-$ 3,124,841 4. Contract #3- Pollard Land Services Inc.-$ 2,778,792 5.Contract #4- Jet Jack Inc.-$ 1,515,834. 6. Contract #5 - Global Heavy Corporation-$ 1,983,000. 7. Contract #6 -Konzel construction Co. Inc.-$ 2,546,000
Bid Results
Water / Sewer
$23,754,711.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 14, 2024
December 16, 2024
Multiple Locations, Redstone Township, PA
Related To This Project
Redstone Township, PA
Bid Date: Sep 11 2025
Redstone Township, PA
Bid Date: Mar 28 2024
Redstone Township, PA
Bid Date: Jan 11 2023
Redstone Township, PA
Bid Date: Jul 13 2022
Redstone Township, PA
Bid Date: Nov 03 2022
Window Replacement - Mcdowell Intermediate High School, Millcreek Township School District - 5574474
Erie, PA
Bid Date: Nov 15 2024
Pittsburgh, PA
Bid Date: Nov 13 2024
Shillington, PA
Bid Date: Dec 05 2024
Stroudsburg, PA
Bid Date: Oct 29 2024
Clairton, PA
Bid Date: Oct 28 2024
Wall, PA
Bid Date: Nov 12 2024
Philadelphia, PA
--
Wilkes Barre, PA
Bid Date: Nov 06 2024
Covington, PA
Bid Date: Nov 22 2024
Philadelphia, PA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
