BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2025 at 8:00 PM

Updated April 1, 2025

Site work, asbestos abatement and renovation of a mixed-use development in San Diego, California. Completed plans call for the renovation of a educational facility; for site work for a educational facility; for asbestos abatement for a educational facility; and water / sewer project.

GENERAL DESCRIPTION OF WORK: The project is located on UC San Diego Health s East Campus and is part of the University s ongoing seismic compliance efforts. The project consists of a seismic retrofit at UCSD East Campus, upgrading associated structures to SPC-4D compliance and enhancing non-structural performance components to NPC-4, NPC-4D, and NPC-5 compliance. Work includes new structural components (concrete shear walls, fiber-reinforced polymer (FRP) strengthening, shotcrete bands, foundation modifications, etc.), bracing of MEP systems, underground storage tanks, mechanical and electrical upgrades to improve resilience and compliance. Portions of this work may require abatement of lead and asbestos containing materials. The retrofit ensures critical facilities meet regulatory requirements for maintaining operational functionality for acute care services beyond 2030. TOTAL ESTIMATED CONSTRUCTION COST: $94,500,000 MC24013B – NPC 5: $5,200,000 MC24013C – NPC 4D West Tower / Bridge: $6,900,000 MC24013D – NPC 4D East Tower: $7,800,000 MC24013E – SPC 4D East Tower / Service Bldg.: $58,600,000 MC24013F – ADA Accessibility: $16,000,000 PREQUALIFICATION OF PROSPECTIVE BIDDERS The University has determined that bidders who submit proposals on this project must be prequalified. Prequalified bidders will be required to have the following California contractor s license: Through a previous recruitment the selected Executive Architect for this project is HDR Architecture, Inc. Estimated total duration of project is: 1,307 calendar days MC24013B (395 Preconstruction Days + 480 Construction Days). MC24013C (395 Preconstruction Days + 912 Construction Days). MC24013D (395 Preconstruction Days + 912 Construction Days). MC24013E (540 Preconstruction Days + 730 Construction Days). MC24013F (180 Preconstruction Days + 365 Construction Days). Question Deadline 03/20/2025 at 2:00 PM PT

Post-Bid

Educational

$94,500,000.00

Public - State/Provincial

Asbestos Abatement, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
295
Active Projects
115
Bidding Soon
1,889
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2025

May 30, 2025

Project location map

Medical Ctr Dr, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.