BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2025 at 8:00 PM

Updated June 28, 2025

Renovation of a museum in San Diego, California. Completed plans call for the renovation of a museum.

Certified SB, including MB, SB-PW, or a DVBE Only 1. Contractor agrees to provide to the California Department of Transportation (Caltrans) all labor, equipment (including lifts) tools, parts, materials, supplies, travel, and incidentals, required to locate water intrusion(s) in the roof and perform repairs to the roof and celling in accordance with the California Historical Building Code (CHBC), and all local, state, and federal building codes. This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 4, Proposed Form of Agreement, for requirement details. Written Question Submittal 03/20/25 In the opinion of the Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is: Shawn Fitzpatrick California Department of Transportation (Caltrans) Email address: shawn.fitzpatrick@dot.ca.gov Phone: (279) 234-2489 Proposed Award Date (estimate) 04/01/25 Payment Bond Requirement: If the successful bidder's bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor's obligations under this Agreement. Start Date 04/01/2025 End Date 11/30/2025 an estimated value of greater than $5,000.00, but not more than $461,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Museum

$35,750.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
286
Active Projects
120
Bidding Soon
1,458
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

May 5, 2025

Project location map

4024 Taylor St, San Diego, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.