Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Muskogee, Oklahoma. Completed plans call for the renovation of a educational facility.
Northeastern State University Synar HVAC. Site Directions: Synar at 2404 W Shawnee St, Muskogee, OK. 74401 Site Address: 2404 W Shawnee St, Question Deadline 10/25/2024 Estimated Project Cost: $300,000 The bid shall be enclosed in a sealed envelope plainly marked and addressed as follows: The name and address of the bidder shall appear in the upper left-hand corner of the envelope. The lower left-hand corner of the envelope shall be marked: Synar HVAC. Description: Work Summaries The following Contract (Bid Group) Work Summaries describe the intended scope of work to be included in the Bid Package. The bid shall include all the requirements of the plans with specifications unless specifically indicated otherwise in this summary. This includes all layout and daily clean up involved with the work. It is the bidder's responsibility to review bidding requirements and forms to insure a complete, safe, and coordinated execution of the Work Package being quoted. Additionally, bidders shall include in their pricing applicable portions of related specification sections normally associated with the work to be done whether specifically indicated by this Contract Work Summary or not. Should any bidder be unclear as to the scope of work required, he is instructed to contact the Owner for resolution prior to bidding. In the absence of written instruction to the contrary, in matters of specification and/or scope of interpretation, bidders shall include the more costly and complete of the possible interpretations. Awarding of Contracts will be based on the best qualified bid. CONTRACT: General Construction Work including but not limited to the following: 1) Drawings and Specifications as identified in Contract Attachment "B." Including But Not Limited To: 1) NSU is a "Tobacco Free" campus; Contractor will be expected to abide by NSU policy and will be held accountable for all Subcontractors on site. 2) Contractor shall be responsible for coordination of all necessary local, state and federal, pre, during and post compliance inspections. Contractor shall provide NSU with documentation of compliance at completion of work. 3) Contractor to be responsible for all permits and fees associated with this scope of work. 4) Work may be halted and resumed at any given time according to NSU's needs. 5) Contractor shall be responsible for mobilization and staging locations to minimize daily operations of the university. 6) Utility terminations shall be in accordance with the governing utility procedures and regulations. NSU will be given a minimum of 24 hours' notice prior to any utility outages/shut-offs. 7) Contractor shall be responsible for coordinating any and all utility locations for the project. 8) Contractor is responsible for furnishing, receiving, protecting and installing specified materials per the construction documents. 9) Contractor is responsible for all field verifications of dimensions and conditions. 10) Contractor is to ensure that construction trash and demolished debris is gathered and disposed of daily in contractor provided trash receptacle. 11) Contractor is responsible for daily clean-up and equipment storage. NSU is not responsible for damaged or stolen property and/or equipment. 12) Contractor shall be responsible for abiding OSHA and NSU safety regulations. 13) Contractor shall be responsible for protection of existing equipment and materials that are not called out to be demolished or repaired. 14) Any discrepancy between the plans/specifications and actual field conditions must be submitted in writing to the owner a minimum of 48 hours prior to the bid closing date. 15) Contractor shall be responsible for demolition, removal, loading and haul off of all materials, scraps and debris. 16) Contractor shall be responsible for repairing rutted or furrowed greenspace, by means of fill dirt and sod, as deemed necessary by the owner. 17) Contractor shall be responsible for any broken or crushed concrete sidewalks, curbs, decks, walls or other cementitious materials. 18) Contractor shall not interfere with building exits or egress paths of any occupied buildings. 19) Contractor shall maintain a site supervisor at all times when the contractor has a presence on campus. 20) Contractor shall be responsible for Final Cleaning. This will be to the Owner's discretion. 21) Contractor shall be responsible for and acknowledge all plans, specifications, and details as shown in all bidding documents. 22) Contractor shall provide Owner training for operations and maintenance of new equipment and systems. 23) Contractor shall supply accurate "red-line" drawing to Owner prior to final payment. Exclusions: 1) Sales Tax.
Post-Bid
Educational
$300,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 31, 2024
December 2, 2024
2400 W Shawnee St, Muskogee, OK
Related To This Project
Muskogee, OK
Bid Date: Oct 16 2024
Muskogee, OK
Bid Date: Oct 21 2024
Muskogee, OK
Bid Date: Nov 14 2024
Muskogee, OK
Bid Date: Nov 14 2024
Muskogee, OK
Bid Date: Nov 18 2024
Muskogee, OK
Bid Date: Nov 01 2024
Muskogee, OK
Bid Date: Oct 10 2024
Muskogee, OK
Bid Date: Oct 04 2024
Muskogee, OK
Bid Date: Oct 17 2024
Muskogee, OK
Bid Date: Oct 02 2024
Muskogee, OK
Bid Date: Oct 01 2024
Muskogee, OK
Bid Date: Sep 16 2024
Muskogee, OK
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.