Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 15, 2024 at 7:00 PM
Updated November 16, 2024
Site work for a civil project in Waterville, Washington. Completed plans call for site work for a water / sewer project.
Wastewater Treatment Plant - 2024. Question Deadline 11/01/2024 Est. Value Notes: $7.5 to $8 Million Description: The Project involves the construction of a new headworks including a mechanically cleaned screen, an influent lift station, pressure sewer, three cell treatment/storage lagoons, a sodium hypochlorite disinfection system, a pivot irrigation system, a gravel access road, and other miscellaneous work; together with all other Work required to complete It is anticipated that this project will be funded in part by the Washington State Department of Ecology. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to any contract or any subcontract resulting from this solicitation for bids. The Contractor will be subject to the Davis Bacon Wage Rates and Washington State Prevailing Wage Rates for Public Works Projects, EEO, Washington State Contracting Laws, etc. The Successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Relate Acts which requires that all laborers and mechanics employed by contractors and subcontractors performing on contracts funded in whole or in part by SRF appropriations in excess of $2,000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, and determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area. The Project has an expected duration of 340 calendar days. Project as shown on the Drawings. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Project involves the construction of a new headworks including a mechanically cleaned screen, an influent lift station, pressure sewer, three cell treatment/storage lagoons, a sodium hypochlorite disinfection system, a pivot irrigation system, a gravel access road, and other miscellaneous work; together with all other Work required to complete the Project as shown on the Drawings.
Post-Bid
Water / Sewer
$8,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 12, 2024
January 13, 2025
To Be Determined, Waterville, WA
Related To This Project
Waterville, WA
Bid Date: Feb 11 2025
Waterville, WA
Bid Date: Jan 07 2026
Waterville, WA
Bid Date: Feb 27 2026
Waterville, WA
Bid Date: Mar 10 2026
Waterville, WA
Bid Date: Mar 05 2026
Waterville, WA
Bid Date: Mar 19 2026
Waterville, WA
Bid Date: Oct 08 2024
Waterville, WA
--
Waterville, WA
Bid Date: Jul 15 2024
Waterville, WA
Bid Date: Apr 12 2024
Waterville, WA
Bid Date: Apr 12 2024
Waterville, WA
Bid Date: Mar 27 2024
Waterville, WA
Bid Date: Mar 26 2024
Waterville, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
