BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of an office development in Onamia, Minnesota. Completed plans call for the remodel of a office development.

Project plans and product specifications will be available to bidders at the pre-bid site visit. General Notes: It is the Contractors responsibility to identify any and all discrepancies in the scope of work, not meeting Industry Standards or that which is inconsistent with the International Building Code (IBC), and Mille Lacs Band of Ojibwe 2016 MLB Project Specification Book. Contractor will secure all permits and fees. Contractor is responsible for a thorough investigation of the scope of work. Contractor will repair any damage to the property or structure created by the scope of work. NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR AND /OR MILLE LACS BAND BUILDING OFFICIAL. COMMUNITY DEVELOPMENT WILL, TO THE GREATEST EXTENT FEASIBLE, GIVE PREFERENCE IN THE AWARD OF CONTRACT TO INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC ENTERPRISES. Project Narrative: This project will consist of an interior remodel to the Community Development office to convert an existing framed cubical workstation space into a conference room. Work will include selective demolition, framing modifications, acoustical ceiling modifications, casework, wood trim, glazing, doors and hardware, flooring, lighting, electrical and interior finishes. Work Scope: Selectively Demo office area space to complete the remodel. Including cubical walls, door openings, flooring, electrical, low voltage and partial ceiling grid. Contractor shall provide and utilize temporary protection of the surrounding office space via Zipwall or similar barrier system. Protect all surrounding spaces and areas during construction activities. Provide and utilize HEPA air filtration / air scrubber during dust producing operations to minimize return air contamination. Frame conference room space according to the floor plan to structure above. Provide backing support for sliding door hardware tracks and TV mount. Coordinate layout with Project Manager. Selectively demo, modify and install electrical and low voltage according to plan. Provide and install drywall finishes, tape, sand and paint. Restore any surrounding finishes affected by this work. Patch and paint existing Community Development Break Area room. Prepare subfloor for installation of new LVT flooring by removing old carpet adhesive, patching and filling of plywood substrate. Shaw Contract Solitude 6"x48" plank fully adhered. Install 4" vinyl base. Owner to select colors. Install pre-finished red oak cased window openings, glazing, stops and casing. Match existing half wall cap finish. Provide and install new rolling barn door slabs, hardware, jamb stops and gaskets. Rolling door hardware: Johnson Hardware 2610S362 for double sliding door. Johnson Hardware 2610F72S for single doors. Door Slabs to be Masonite Stile and Rail Oak 4 glass lite doors. Include door pull handles, Oak parting stops on door opening interior with continuous brush gaskets for acoustical sound control. Modify surrounding open office acoustical suspension grid system with new perimeter wall angles on the new walls. Install new grid system within the new conference room space per plan. (USG Fineline DXF 9/16" grid system. USG Mars Fineline Bevel 86985 2'x2'). Replace ceiling tiles in the existing Community Development Breakroom. Modify sprinkler heads within the space to provide adequate coverage. See RCP. Modify supply air diffusers. Add return air grille. See RCP. Install new LED lighting (Day-Brite by Signify recessed selectable backlit panel 2'x4' 2SBP355L8CS-4-UNV-DIM) with occupancy sensor and wall dimming control switches. Replace 2 recessed can lights in Community Development hall, and add 2 recessed can lights. (Lithonia LDN6 selectable, match building lighting voltage) See RCP. Install fire alarm horn strobe device in the new conference room. Demo and replace existing Community Development Break Area casework with semi-custom oak hardwood cabinets and countertop (Silestone) Provide and install new 32" undermount stainless steel double bowl sink: American Standard 18DB6311800S.075 and faucet: Delta Classic 19810-SS-DST. Provide and install new semi-custom oak hardwood base cabinets and countertop (Silestone) in the new conference room. Contractor to include $7,500 Owner Contingency Allowance in the base bid to be utilized by the Owner for unseen conditions. Contractor to submit for MLBO Building permitting. Permit fee schedule will be provided. Contractor to include 1/2 % TERO fee in base bid. Submission of TERO Compliance plan for approval will be required. Bid Alternate #1: Open Office Lighting and Ceiling Tile Upgrade Added cost to upgrade entire Community Development Open Office space LED light fixture replacement and acoustical ceiling tile change out. Bid Alternate #2: Private Office Lighting and Ceiling Tile Upgrade Added cost to upgrade Community Development private office space LED light fixture replacement and acoustical ceiling tile change out. Specified Product Substitutions: All proposed product substitutions must be approved by the Project Coordinator 5 days prior to bid. Any approved substitutions, will be made available to all bidders. Bidding notes: Submit proposal in lump sum (supply and install), not to exceed amount All Contractors (including subcontractors) must comply with Davis Bacon wage requirements. All Contractors must provide the following along with their bid submittal: a. Completed and signed MLB Community Development Construction Bid Form b. A copy of Current MLB Vendor's License (or a copy of the submitted application) c. A copy of Current Insurance Certificate d. Surety Bond Letter e. A copy of Subcontractor/Material Supplier list f. A copy of valid State of Minnesota Contractor's License g. A copy of Authorized Signature Sheet (submitted with first bid submittal) All Contractors must comply with all Mille Lacs Band of Ojibwe American Indian Employment requirements (see 18 MLBSA 5). Contact Lori Trail at (320) 532-4778. All proposals must be mailed and labeled as follows: Mille Lacs Band of Ojibwe Commissioner of Community Development Sealed bid: Community Development Conference Room P.O. Box 509 Onamia, MN 56359 Please note that the bids must be submitted via mail to the P.O. Box. FedEx and UPS will not deliver to a P.O. Box and the Onamia post office will not accept hand delivered items. Please plan accordingly to ensure the timely receipt of your bid submittal. **The Band reserves the right to reject any bid that it is unable to collect at the Onamia post office by the bid deadline date and time, provided that the Band has made diligent and reasonable efforts to collect the bid. The Band reserves this right even in the event that the bid has been postmarked before the deadline. PROPOSALS NOT SUBMITTED IN THIS MANNER WILL BE REJECTED. Licensing: Firms must be licensed with the Mille Lacs Band of Ojibwe. A copy of this license (or the license application) must accompany each bid. Licensing process can take several weeks. If you are not currently licensed with the MLBO, please submit a copy of your license application along with your proposal. Contact Elizabeth Thornbloom at (320) 532-8274 or via email at EThornbloom@grcasinos.com with questions regarding licensing and for the license application. PERMIT AND CONTRACTOR REQUIREMENTS: Permits: Contractors are responsible to attain all necessary permits for all work, including Mille Lacs Band of Ojibwe (MLBO) Permits. Bonding Requirements: In accordance with 2016 MLB Project Specification Book. MLBSA Section 17 Procurement Statue Ordinance 03-06 states the following: Section 17. Bonding A. In construction contracts that are federally funded or deemed commercial, bonding is required. These types of contracts shall demand a performance bond not less than twenty (20%) percent of the total contract price, but not to exceed $500,000.00. A performance bond requirement is to ensure that, if a contractor defaults, the Band may request that the surety pay the expense incurred to complete the construction contract. B. In addition, all construction contracts identified as federally funded or commercial shall be covered by a payment bond equal to one payment installment or cover subcontractors/suppliers as determined by the Contracting Officer or his agents. The payment bond must contain language stating that if the contractor fails to make a payment to its subcontractors/suppliers, the surety will make the necessary payment.

Post-Bid

Office

$1,640,000.00

Public - Federal

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
31
Bidding Soon
341
All Active Projects
128
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

December 30, 2024

img_map_placeholder

43408 Oodena Dr, Onamia, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.