BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Boulder City, Nevada. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Work includes removals of existing 3/4", and 1" water services, relocation of existing service lines as needed to attain 4' separation between water and sewer laterals and make the service line perpendicular to the water main, connection to existing or relocated corporation stop at the main with a brass adapter, and installation of new copper water service (size to match existing) from the main to the meter for 22 water services within Boulder City. This work shall also include installation or replacement of water meters, meter boxes, and/or Encoder Receiver Transmitter modules (ERTs) for locations specified (these items will be supplied by the City). This project shall include asphalt replacements. A pre-bid conference will not be held for this project. A proposal guarantee is not required. Workman's Compensation Insurance, Faithful Performance Bond in the amount of one hundred percent (100%) of the total bid price, a Labor and Material Bond in the amount of one hundred percent (100%) of the total bid price, and a Guarantee Bond will be executed as part of the contract agreement. The successful bidder is required to obtain a City of Boulder City Business License prior to the issuance of the Notice to Proceed. All subcontractors, suppliers, deliveries, or any other associated business doing business in Boulder City are required to obtain a City of Boulder City Business License prior to performing any work on the project. All work including deficiency list items must be completed within sixty (60) calendar days after the date of the *Notice to Proceed by the Owner. The Contractor shall provide a one-year warranty for the scope of work performed in this contract. The one-year warranty shall be from the date of the Notice of Completion. Question Deadline 10/17/2024 at 12:00 PM PT All questions relative to this project prior to the opening of bids shall be completed utilizing electronically. The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the Owner. Engineer's estimate of probable cost: $165,000 - $185,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Water / Sewer

$185,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
19
Bidding Soon
445
All Active Projects
217
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

November 25, 2024

img_map_placeholder

Blue Lake Dr, Boulder City, NV

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.