Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 6, 2024 at 7:00 PM
Updated June 21, 2025
Site work and paving for a road / highway in Eastpoint, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Counties: Franklin Road Name: SR 30 (US 98) RANKLIN COUNTY (49010000 & 49010001) Limits: From Apalachicola River Bridge to Franklin St Project(s): 22392035201(*) Federal Aid No: D323004B Project(s): 22392035203 Federal Aid No: D323004B Total Roadway Length: 10.547 Miles Total Bridge Length: 2.684 Miles Total Proposal Length: 13.231 Miles Contract Days: 197 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Please read the full advertisement Description: The Improvements under this Contract consist of milling and resurfacing SR 30 (US 98) from Apalachicola River Bridge to Franklin Street; in Franklin County, FL. There are two FPID numbers within this Contract. FPID 223920-3-52-01 includes milling and resurfacing. FPID 223920-3-52-03 includes the addition of articulating concrete block to protect shoulders. Question Deadline 11/06/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 006 - Drainage Improvements / Resurfacing - SR 30 (US 98)
Award
Roads / Highways
$4,631,224.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 13, 2024
January 13, 2025
FL-30, Eastpoint, FL
Related To This Project
Eastpoint, FL
Bid Date: Jan 29 2025
Eastpoint, FL
Bid Date: Apr 10 2025
Eastpoint, FL
--
Eastpoint, FL
Bid Date: Apr 30 2025
Eastpoint, FL
Bid Date: May 15 2025
Eastpoint, FL
Bid Date: Sep 25 2024
Eastpoint, FL
Bid Date: Oct 24 2024
Eastpoint, FL
Bid Date: Jul 15 2024
Eastpoint, FL
Bid Date: Jul 23 2019
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
