Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 2, 2025 at 7:00 PM
Updated January 7, 2025
This is a service / maintenance or supply contract in Aurora, Colorado. Contact the soliciting agency for additional information.
The purpose of RFQ modification 0004 is to: Provide an updated Statement of Work as the Backflows are being removed. The purpose of this modification is to: Answer questions that were asked (see below) Extend RFQ response date to 12/12/2024 due to questions and answers.. Questions and Answers Below: Q: The RFQ calls out 13 bldgs but I count 15 Can we verify if it is 13 or 15 please. A: There are 14 bldgs. Q: It says there are dry systems in the 3 garages but doesn t say how many. Could we verify how many dry systems per garage A A: There is a dry system in PVS and PVN garages each with 4 risers and a dry system in Bldg B with 2 risers Q: Do we have a general time for how long the previous annuals, semi-annuals, and quarterly's have taken. A Without having a site visit and being able to walk the complex it is difficult to estimate a time for completion and what size team we will need to have working to meet your expectations. A A A: Annuals and semi annuals historically take 3 days and quarterlies are usually done in 1-2 days Q: Do we need to keep someone at the panel at all times while performing the test A: Anytime water is to be flowed the Vendor will need someone on the panel. Q: Could you provide any available inspection reports, assessments, or related documents to help us refine the scope of work Having access to this information will allow us to align our approach with past findings and address all necessary requirements effectively. A: Information will be available at site walk. Q: To clarify, the testing is only for the Kitchen Hood Fire Suppression A Testing Other areas are mentioned but would need to get a better idea of what we will be doing exactly. A: All Fire Suppression at Rocky Mountain Regional Medical Center to include all Kitchen Hoods and all listed in SOW.A Information will be available at site walk. Q: Are all backflows listed in the Scope of Work (SOW) for fire prevention backflows If not, how many are domestic/irrigation A: See attached. Q: To aid all potential offerors and the government in ensuring all quotes are equally comparable with regards to the scope of services being requested, the current inspection reports will answer many questions and clarify the SOW for all offerors. Typically, in the past when the government provides previous inspection reports, any personal or company information is redacted. Can you please provide last year s inspection reports for system information and counts A: Information will be available at site walk. Q: Are there any special testing frequencies outside of what is required by NFPA 25 A: No. See SOW Q: Will we need to provide visual-only inspection frequencies and requirements listed in NFPA 25 An example would be monthly/quarterly visual inspections that may be handled in-house. A: See SOW. All testing and inspection done by vendor. Q: When was the last 3-year full trip completed on each dry system Does that need to be included in this pricing A: All 3-year testing will need to be complete during the Base or Option Years. Previous inspections will be available during Site Walk Q: When was the last 5-year internal inspections completed Does that need to be included in this pricing A: All 5-year testing will need to be complete during the Base or Option Years. Previous inspections will be available during Site Walk Q: There is no indication of Hose Valves in this SOW. Will there be a need to do any hose valve inspections If so, can information be provided on hose valves. A: RMR VA MC does not have Hose Valves or Hoses Q: Clarity is requested on after-hour times that inspections are allowed to be performed for kitchen hoods. What would these evening hours beA A: After 1800. Work complete before 0330.
Post-Bid
Medical
Public - Federal
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2025
March 6, 2025
1700 N Wheeling St, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Oct 30 2024
Aurora, CO
Bid Date: Nov 15 2024
Aurora, CO
Bid Date: Nov 08 2024
Aurora, CO
Bid Date: Nov 15 2024
Aurora, CO
Bid Date: Nov 04 2024
Aurora, CO
Bid Date: Nov 08 2024
Aurora, CO
Bid Date: Dec 09 2024
Aurora, CO
Bid Date: Oct 11 2024
Aurora, CO
Bid Date: Oct 11 2024
Aurora, CO
Bid Date: Oct 10 2024
Aurora, CO
Bid Date: Oct 18 2024
Aurora, CO
Bid Date: Nov 11 2024
Aurora, CO
Bid Date: Oct 15 2024
Aurora, CO
Bid Date: Oct 07 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.