BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2025 at 7:00 PM

Updated November 5, 2025

Renovation of a detention facility in Toledo, Ohio. Completed plans call for the renovation of a detention facility.

Contract Estimated Cost General Trades (Lead) $1,889,650.00 Alternate A-1 $ 10,500.00 Alternate A-2 $ 82,750.00 Alternate A-3 $ 82,750.00 Alternate A-4 $ 82,750.00 Alternate A-5 $ 91,560.00 And any proper combination submitted on electronic Bid Form Bid Documents: Electronically Allowance A-1 Additional Funds to be used for miscellaneous fire alarm upgrades as needed. 75,000.00 75,000.00 GENERAL INFORMATION: Entrance onto the Facility property will be at Entry Building & Sallyport. All vehicles will stop and give the name(s) of all occupants and provide Stateapproved picture identification. Personal vehicles will be parked in a designated area outside the Facility with vehicles locked at all times. All persons are subject to search upon entering or leaving the Facility. All vehicles are subject to “shake down” before entering or leaving Institution property. Therefore, all vehicles should be free of contraband. Vehicles for use in construction work will be allowed to be driven to the construction site. These vehicles will be escorted by Construction Escort Officer when the construction site is not maintained in an area separate from the main compound. The windows must be rolled up completely and the doors locked. The Construction Escort Officers will maintain custody of the keys for the vehicle and the required “Club” steering devices while inside the compound. Keys will be returned to the Rear Sallyport while the vehicle is being unloaded.

Award

Jails / Prisons

$1,594,777.00

Public - State/Provincial

Renovation

70

8

2

8

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
330
Active Projects
171
Bidding Soon
2,408
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2025

November 3, 2025

Project location map

2001 E Central Ave, Toledo, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.